# Project Tracker ID Source Status Priority Standard(s) Subject Updated
2156 IEC 61850 Certificate IEC 61850 Certificate Approved Normal GRZ200 [Toshiba Corporation] 07/08/2021 04:27 PM Actions
2507 IEC 61850 Certificate IEC 61850 Certificate Approved Normal GSC1000 [TOSHIBA Corporation] 07/08/2021 04:43 PM Actions
2005 IEC 61850 Certificate IEC 61850 Certificate Approved Normal GTNET-GSE [RTDS Technologies Inc.] 07/08/2021 04:21 PM Actions
3015 IEC 61850 Certificate IEC 61850 Certificate Approved Normal GTW-Gateway Software for PACiS Solution [Schneider Electric] 07/11/2021 10:00 AM Actions
2493 IEC 61850 Certificate IEC 61850 Certificate Approved Normal H-PAC-001 [HYOSUNG Corporation] 07/08/2021 04:42 PM Actions
3095 IEC 61850 Certificate IEC 61850 Certificate Approved Normal H-PAC-001 [Hyosung Heavy Industries Co., LTD.] 08/05/2021 02:00 PM Actions
3096 IEC 61850 Certificate IEC 61850 Certificate Approved Normal H-SEAM- Client [Hyosung Heavy Industries Co., LTD.] 08/06/2021 09:21 AM Actions
3097 IEC 61850 Certificate IEC 61850 Certificate Approved Normal H-SEAM-Server [Hyosung Heavy Industries Co., LTD.] 08/31/2021 08:38 AM Actions
2978 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HAMCS H1-CCP Converter Control & Protect [Hyosung Heavy Industries Co., Ltd.] 07/11/2021 11:00 AM Actions
6584 CIM Joint Issues CIM Issues New High Handling unit multiplier needs joint WG concensus on approach 11/08/2023 07:03 AM Actions
5014 WG13 Issues CIM Issues Review Normal Handling unit multiplierNeed a policy for WG13 with respec 10/14/2023 02:42 AM Actions
6537 61850-7-5 and 61850-7-500 IEC61850-7-5 New Normal Harmonizing expressions in 7-500 Ed.1 10/06/2023 08:13 AM Actions
2082 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HB-PMS-V1 [Hanbit EDS Co., Ltd.] 07/08/2021 04:25 PM Actions
2604 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HBCIDAS Circuit Breaker Monitoring Devic [Hanbit EDS Co., Ltd.] 07/08/2021 04:47 PM Actions
2570 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HCCP-10 : HVDC Converter Control/Protect [HYOSUNG Corporation] 07/08/2021 04:45 PM Actions
2961 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HEPI 61850 ESS Server [Hankook Electric Power Information Co.] 07/11/2021 11:02 AM Actions
6649 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HGMAP-BCS 12/16/2023 10:49 AM Actions
1951 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HIMAP-BCS Hyundai Intelligent [Hyundai Heavy Industries Co., Ltd.] 07/08/2021 04:19 PM Actions
2126 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HiMAP-CCU [Hyundai Heavy Industries Co., Ltd.] 07/08/2021 04:26 PM Actions
2125 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HiMAP-GCU [Hyundai Heavy Industries Co., Ltd.] 07/08/2021 04:26 PM Actions
2124 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HiMAP-TCU [Hyundai Heavy Industries Co., Ltd.] 07/08/2021 04:26 PM Actions
1894 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HiPAS HMI [Hyundai Heavy Industries Co., Ltd.] 07/08/2021 04:14 PM Actions
2479 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HIPASE-P [Andritz Hydro GmbH] 07/08/2021 04:41 PM Actions
1950 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HIPDS Hyundai Intelligent Prev [Hyundai Heavy Industries Co., Ltd.] 07/08/2021 04:19 PM Actions
2079 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HiPDS-T [Hyundai Heavy Industries Co., Ltd.] 07/08/2021 04:25 PM Actions
6238 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HMI VICOM-PES 01/30/2023 08:07 AM Actions
5950 WG14 Part 9 Issues CIM Issues New Normal

61968-9, 61968-11

How is readCycle used, should the definition be updated? 05/31/2023 07:13 PM Actions
5347 Server Issues Resolved Normal How should time correlated GOOSE change status in GOOSE Performance test 10/04/2022 09:11 AM Actions
6579 IEC TC57 WG10 Future Work WG10 Future Work Vattenfall New High

IEC 61850-6

How to add utility process name to DOs 02/19/2024 10:43 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
5316 CIM Joint Issues CIM Issues Open Normal

IEC 61968 series

How to best associate the CIM with other related information standards such as ERP, GML, and BIM 02/13/2023 12:23 PM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
6556 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal How to impact the data quality of a data with respect to the communication links, the intermediate processing, the device hosting it. 10/26/2023 04:00 AM Actions
6207 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-6

How to manage update of an IEDName or LDName for object references when valImport is false 06/05/2023 01:58 AM Actions
6558 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal How to model composed functions 10/26/2023 04:01 AM Actions
6638 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HP-Z8-G4 12/13/2023 07:48 AM Actions
6586 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HP-Z8-G4 11/08/2023 07:07 PM Actions
2552 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HPCi High Perf. Controller [GE Power Conversion ] 07/08/2021 04:44 PM Actions
2825 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HPCi High Performance Controller [GE Power Conversion] 07/08/2021 04:55 PM Actions
2566 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HS-CSD - Controlled Switching Device [HYOSUNG Corporation] 07/08/2021 04:45 PM Actions
2894 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HS-CSD CD Controlled Switching Device Co [HYOSUNG Corporation] 07/08/2021 04:58 PM Actions
2892 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HS-ICD Substation Automation Information [HANSHIN ELECTRIC Co.,Ltd.] 07/08/2021 04:58 PM Actions
2929 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HS-TNM-61850C Substation Automation Info [Hyosung Heavy Industries Co., Ltd.] 07/11/2021 11:05 AM Actions
2876 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HS1902-HMI Substation Automation Operati [HANSHIN ELECTRIC Co.,Ltd.] 07/08/2021 04:57 PM Actions
6288 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HSC RTU for Industrial Automation and Control Systems 03/10/2023 01:33 PM Actions
2812 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HTEC-10 Intelligent Transformer Informat [NANJING LITONGDA ELECTRICAL TECHNOLOGY CO., LTD.] 07/08/2021 04:55 PM Actions
6153 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1691 Contradictory statement for Mod.stVal 10/26/2023 05:19 AM Actions
6154 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1698 AnOut in GAPC 10/26/2023 05:19 AM Actions
6155 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1706 Missing LN for Miniature Circuit Breaker (MCB) 10/26/2023 05:19 AM Actions
3102 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1744 Clarification of Start Times in StrTm.setCal 02/08/2024 05:09 AM Actions
6156 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-3

https://iec61850.tissue-db.com/tissue/1748 Arrays of CDC 10/26/2023 05:15 AM Actions
6158 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1760 - OMulti for MMET data objects 10/26/2023 05:14 AM Actions
6159 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-90-3

https://iec61850.tissue-db.com/tissue/1789 SCBR - Coilxxx-Data-Objects shall be Omulti 10/26/2023 05:14 AM Actions
6160 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-90-29

https://iec61850.tissue-db.com/tissue/1796 LPHD.PwrSupAlm as Omulti 10/26/2023 05:13 AM Actions
6161 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-5

https://iec61850.tissue-db.com/tissue/1797 - SwModKey dependency of CSWI from LLN0 10/26/2023 05:08 AM Actions
6162 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1803 - Mechanical Blocking of 3 way switches 10/26/2023 05:07 AM Actions
6163 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-5

https://iec61850.tissue-db.com/tissue/1804 - When e.g. LocSta = false, result of command to switch DO Mod with "station-control" not clear. 10/26/2023 05:06 AM Actions
6164 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1825 - Permission mode for control/setting of a scheduled entity from a client 10/26/2023 05:03 AM Actions
6165 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1844 - Implementation of SumSwARs in 3-phase circuit breaker inaccurate 10/26/2023 05:01 AM Actions
6524 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/670 - enable/disable LN via setting / new DO SetMod 10/26/2023 03:54 AM Actions
2630 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HUSKY RTU 6049-E70 Remote Terminal Unit [Synergy Systems & Solutions] 07/11/2021 10:10 AM Actions
3009 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HVDC-IED [GENAD SYSTEM Co.] 07/08/2021 05:02 PM Actions
2420 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HyCon Controller [Voith Hydro Holding GmbH & Co. KG] 07/08/2021 04:38 PM Actions
1906 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HyCon Controller [Voith Hydro Holding GmbH & Co. KG] 07/08/2021 04:18 PM Actions
4946 WG13 Issues CIM Issues Open Low HydroPowerPlant inherit PSR There is Plant class that inher 09/14/2021 03:47 PM Actions
2039 IEC 61850 Certificate IEC 61850 Certificate Approved Normal Hyosung NeoProPAC-GBC [Hyosung] 07/08/2021 04:23 PM Actions
2040 IEC 61850 Certificate IEC 61850 Certificate Approved Normal Hyosung NeoProPAC-TBU [Hyosung] 07/08/2021 04:23 PM Actions
2038 IEC 61850 Certificate IEC 61850 Certificate Approved Normal Hyosung NeoProPAC-TPU [Hyosung] 07/08/2021 04:23 PM Actions
2705 IEC 61850 Certificate IEC 61850 Certificate Approved Normal HZP681 110kV Integrated Intelligent Cont [HNAC TECHNOLOGY CO., LTD.] 07/08/2021 04:50 PM Actions
1933 IEC 61850 Certificate IEC 61850 Certificate Approved Normal iBC 5000 (Elitel 5/5000) [ELIOP S.A.] 07/08/2021 04:19 PM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
6520 SCL Tooling Issues Rejected Normal ICT Ed2.1 refers to TICS but there no part 6 tissues 10/31/2023 08:35 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
6605 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

TR IEC 61850-7-500

Identification of three phase trip with ACT DO 11/21/2023 08:13 AM Actions
5283 WG14 Part 6 Issues CIM Issues Review Normal

61968-6, 61968-Common

Identifying non-utility crew 11/09/2023 11:22 AM Actions
2704 IEC 61850 Certificate IEC 61850 Certificate Approved Normal iDP-110 110kV Integrated Intelligent Con [BEIJING DEVOTE RELAY PROTECTION AUTOMATION TECHNOLOGY CO.,LTD.] 07/08/2021 04:50 PM Actions
2703 IEC 61850 Certificate IEC 61850 Certificate Approved Normal iDP-110 110kV Integrated Intelligent Con [BEIJING DEVOTE RELAY PROTECTION AUTOMATION TECHNOLOGY CO.,LTD.] 07/08/2021 04:50 PM Actions
6182 DNP Conformance Certificates DNP Conformance Certificate Approved Normal IDS ACOS 750 11/13/2022 11:25 PM Actions
1876 IEC 61850 Certificate IEC 61850 Certificate Approved Normal IDS ACOS750 [IDS GmbH] 07/08/2021 04:13 PM Actions
2379 IEC 61850 Certificate IEC 61850 Certificate Approved Normal IDV [ZIV GRID Automation S.L.] 07/08/2021 04:36 PM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
6358 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850

IEC 61850-7-4 list of abbreviations 10/26/2023 04:56 AM Actions
6256 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-7-4

IEC 61850-7-4 list of abbreviations 06/06/2023 08:32 AM Actions
6167 IEC 61850 User Feedback Task Force Support email Resolved Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 06/05/2023 01:58 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
6613 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-6

IEC61850 Tissue 1833: Service SettingGroups.ConfSG clarification 02/08/2024 01:38 AM Actions
6604 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 02/08/2024 01:42 AM Actions
3100 IEC 61850 User Feedback Task Force Improvement 2 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 06/05/2023 01:58 AM Actions
5941 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 02/08/2024 04:39 AM Actions
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 06/05/2023 01:58 AM Actions
5936 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 02/08/2024 04:49 AM Actions
3099 IEC 61850 User Feedback Task Force Improvement 1 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 06/05/2023 01:58 AM Actions
6572 WG14 Part 11 Issues CIM Issues New Normal IEC61968CIMVersion class is in triplicate 11/02/2023 04:07 PM Actions
4973 WG13 Issues CIM Issues Open Normal IEC61970Dependencies diagram not right for new Base and Dyn 09/14/2021 03:47 PM Actions
5847 WG16 Issues CIM Issues Open Normal IEC62325 Dependency Diagram Update 08/08/2022 05:59 PM Actions
1992 IEC 61850 Certificate IEC 61850 Certificate Approved Normal IED 630 [ABB Oy] 07/08/2021 04:21 PM Actions
1981 IEC 61850 Certificate IEC 61850 Certificate Approved Normal IED 650 [ABB AB] 07/08/2021 04:20 PM Actions
2330 IEC 61850 Certificate IEC 61850 Certificate Approved Normal IED 670 1.0 [ABB Power Technology AB] 07/08/2021 04:34 PM Actions
2316 IEC 61850 Certificate IEC 61850 Certificate Approved Normal IED 670 1.1.12 [ABB AB] 07/08/2021 04:34 PM Actions