Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
592 IEC 61850 User Feedback Task Force Feature IntApp IOP_2019 Closed Normal Invalid SCL file due to wrong allocation fo GoCBs 06/21/2022 09:29 AM Actions
591 IEC 61850 User Feedback Task Force Feature 1857 IOP_2019 Closed Normal

IEC 61850-6

A reservation could not be made via SCL for an IED’s report due to the lack of a ConnectedAP associated with the client’s AP 07/05/2022 08:34 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
589 IEC 61850 User Feedback Task Force Feature 1700 IOP_2019 Closed Normal

IEC 61850-6

Usage of max of RptEnabled when indexed attribute is false and the relationship to RptEnabled 07/05/2022 08:28 AM Actions
588 IEC 61850 User Feedback Task Force Feature 1548 IOP_2019 Closed Normal

IEC 61850-6

More than one redundant PhysConn for ConnectedAP of IED AP and no redundant PhysConn on same AP 06/21/2022 09:28 AM Actions
587 IEC 61850 User Feedback Task Force Feature 1404 IOP_2019 Closed Normal

IEC 61850-6

LNodeTypes and DOTypes not used in the IED section - is it allowed to keep them in DataTypeTemplate section? 02/11/2021 07:01 AM Actions
586 IEC 61850 User Feedback Task Force Feature 1340 IOP_2019 Closed Normal

IEC 61850-6

Client application cannot connect to IED that are having issue with format of AP-Title 07/05/2022 08:26 AM Actions
585 IEC 61850 User Feedback Task Force Feature 1337 IOP_2019 Closed Normal

IEC 61850-6

SCT unable to configure the device to communicate on multiple subnets due to having a single AP (with all Eth. Ports) 07/05/2022 08:24 AM Actions
584 IEC 61850 User Feedback Task Force Feature 1122 IOP_2019 Closed Normal

IEC 61850-6

SCL validation - Should all name parts of PhV be contained in the doName? 05/09/2023 09:12 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
442 IEC 61850 User Feedback Task Force Bug 5 Vattenfall Closed High

IEC 61850-90-30

Maping LNode (substation section) to LN (IED section) 12/05/2023 08:30 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
443 IEC 61850 User Feedback Task Force Feature 6 Vattenfall Closed Normal

IEC 61850-7-1

Requirement for guideline - generic interfacing logical nodes are used for outputs and inputs ( destroys the semantic meaning of signals) 02/11/2021 07:58 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
440 IEC 61850 User Feedback Task Force Support 3 Vattenfall Closed Normal The specified sigal has a utility process name independent of used protcol. E.g. "start of distance protection". Also link to a 06/21/2022 09:19 AM Actions
441 IEC 61850 User Feedback Task Force Improvement 4 Vattenfall Closed High

IEC 61850-90-30

Limitations of one to one mapping between LNode and LN 12/05/2023 08:28 AM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
(3026-3042/3042) Per page: 25, 50, 100

Also available in: Atom CSV PDF