Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
5932 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R2 New Normal

IEC 61850-6

CIM-61850 Harmonization - Extend list of equipment type codes 02/08/2024 05:07 AM Actions
5931 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R3 New Normal

IEC 61850-6

CIM-61850 Harmonization - Add string attribute psrType to tPowerSystemResource. 02/08/2024 05:08 AM Actions
5930 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R6 New Normal

IEC 61850-6

CIM-61850 Harmonization - mRID attribute in SCL for Equipment, Terminals, ConnectivitNodes 02/08/2024 05:08 AM Actions
5929 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R8 New Normal

IEC 61850-6

CIM-61850 Harmonization - allow Terminals with no connections - use explicit ConnectivityNode.name = None 02/08/2024 05:08 AM Actions
5928 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R9 New Normal

IEC 61850-6

CIM-61850 Harmonization - extend tPhaseEnum to match CIM PhaseCode 02/08/2024 05:23 AM Actions
6714 IEC TC57 WG10 Future Work WG10 Future Work IEC PAS 61850-90-3 New Normal Improve the models used for power regulation 02/20/2024 11:04 AM Actions
5103 IEC TC57 WG10 Future Work WG10 Future Work IEEE H27 New Normal

IEC 61850-7-3

Modified/new CDC for IEEE H27 02/09/2024 03:21 AM Actions
6144 IEC TC57 WG10 Future Work WG10 Future Work IOP 2022 New Normal

IEC 61850-6

Need to add SCL mechanism to define a minimum MinTime 10/26/2023 05:21 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
5935 IEC TC57 WG10 Future Work WG10 Future Work MH New Normal

IEC 61850-7-3

Extension of CDC ASG 02/08/2024 04:51 AM Actions
5078 IEC 61850 User Feedback Task Force Feature 2 MH Resolved Normal

IEC 61850-7-1 / 7-2 Ed2.1 / 7-5/7-500

Clarification on the ctlModel 1/3 06/05/2023 01:58 AM Actions
5079 IEC 61850 User Feedback Task Force Feature 3 MH Resolved Normal

IEC 61850-7-1 Ed2.1, 7-500

Clarification on the ctlModel 2/3 06/05/2023 01:58 AM Actions
5080 IEC 61850 User Feedback Task Force Feature 4 MH Resolved Normal

IEC 61850-7-1 Ed2.1 ,7-500

Clarification on the ctlModel 3/3 06/05/2023 01:58 AM Actions
5081 IEC 61850 User Feedback Task Force Feature 5 MH Resolved Normal

IEC 61850-7-1 Ed2.1/7-4 Ed2.1 Annex B/7-500

Clarifications on the local/remote concept 1/8 06/05/2023 01:58 AM Actions
(2051-2075/2205) Per page: 25, 50, 100

Also available in: Atom CSV PDF