Project

General

Profile

IEC61850-7-5 #6698

Integrate work from AHTF Control Between Functions

Added by Keith Gray 10 months ago. Updated 24 days ago.

Status:
New
Priority:
Normal
Assignee:
-
Start date:
02/07/2024
Due date:
% Done:

0%

Source:
Category:
Not yet categorized
TF 7-5 Project document:
IEC 61850-7-5, IEC 61850-7-500
Related TISSUE:

Description

Collect the work created by this AHTF and integrate it into 7-5 and 7-500. We need to locate the latest draft of the document, review that draft, and determine how to integrate it with our documents.


Related issues

Related to 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6787: Harmonization of Table 4 with Figure 22In ProgressMichael Haecker05/15/2024

Actions

Also available in: Atom PDF