IEC61850-7-5 #6382
Clarification on the ctlModel 1/3
Status:
New
Priority:
Normal
Assignee:
-
Start date:
09/20/2021
Due date:
01/20/2022 (over 2 years late)
% Done:
0%
Source:
Category:
Not yet categorized
TF 7-5 Project document:
IEC 61850-7-5
Related TISSUE:
Description
What is the purpose of 'ctlModel' at X group level, Y group level respectively? Operator switchgear controls are managed by CSWI LN, so a Select to allow the operator to think twice before Operate is not needed on X group level.
Related issues
Updated by Vladan Cvejic over 1 year ago
- Copied from Feature #5078: Clarification on the ctlModel 1/3 added
Updated by Michael Haecker about 2 months ago
- TF 7-5 Project document IEC 61850-7-5 added
Reference is made to the comment from Kota Kawasaki 2024-10-30
The relevance of 'XCBR.Pos.ctlModel' towards controls via MMS and towards controls initiated from GOOSE subscription has to be clarified.
Preliminary answer: 'ctlModel'is of relevance from controls via MMS only.
The answers has to find into the standard.