- 10:01 AM IEC 61850 User Feedback Task Force Feature #7033 (Resolved): Addition of DO SPS in the LN KPMP
- In the LN KPMP, there are DO MinOpTmm and MaxOpTmm (CDC ING) to set the minimum and maximum operating times of the pu...
- 07:00 AM IEC 61850 User Feedback Task Force Feature #7032 (Triage): Addition of a DO in XCBR indicating that the contacts have started to separate
- In modern circuit breakers, in addition to the open and closed contacts, there is an additionnel contact called "inte...
01/18/2024
- 07:58 AM 61850-7-5 and 61850-7-500 IEC61850-7-5 #6545 (Waiting for Release): Propagation of detailQual
- Modifications taken into account into the Clause 5.1 of the document.
Link to the document :
https://collaborate.ie...
06/02/2022
- 03:58 AM IEC 61850 User Feedback Task Force Feature #5374 (In Progress): Creation of a new LN for protection function
- To detect faults occurring between the busbar and the HV side of a transformer/autotransformer, a specific function b...