General

Profile

Christophe Ghafari

  • Login: ghafarichr
  • Registered on: 05/31/2022
  • Last connection: 11/26/2024

Issues

open closed Total
Assigned issues 2 0 2
Reported issues 3 0 3

Projects

Project Roles Registered on
61850-7-5 and 61850-7-500 Manager 06/14/2023
IEC 61850 User Feedback Task Force Reporter 06/14/2022

Activity

11/26/2024

03:32 AM IEC 61850 User Feedback Task Force Feature #5374: Creation of a new LN for protection function
TC95 should present this issue as coordination request between TC95 & TC57. Christophe Ghafari

10/21/2024

10:01 AM IEC 61850 User Feedback Task Force Feature #7033 (Resolved): Addition of DO SPS in the LN KPMP
In the LN KPMP, there are DO MinOpTmm and MaxOpTmm (CDC ING) to set the minimum and maximum operating times of the pu... Christophe Ghafari
07:00 AM IEC 61850 User Feedback Task Force Feature #7032 (Triage): Addition of a DO in XCBR indicating that the contacts have started to separate
In modern circuit breakers, in addition to the open and closed contacts, there is an additionnel contact called "inte... Christophe Ghafari

01/18/2024

07:58 AM 61850-7-5 and 61850-7-500 IEC61850-7-5 #6545 (Waiting for Release): Propagation of detailQual
Modifications taken into account into the Clause 5.1 of the document.
Link to the document :
https://collaborate.ie...
Christophe Ghafari

06/02/2022

03:58 AM IEC 61850 User Feedback Task Force Feature #5374 (In Progress): Creation of a new LN for protection function
To detect faults occurring between the busbar and the HV side of a transformer/autotransformer, a specific function b... Christophe Ghafari

Also available in: Atom