Feature #7033
Addition of DO SPS in the LN KPMP
Status:
Resolved
Priority:
Normal
Assignee:
-
Category:
-
Start date:
10/21/2024
Due date:
12/20/2024 (Due in 29 days)
% Done:
0%
Estimated time:
ID:
Source:
TF Unique ID:
WG10 Proposal:
Estimated Completion:
Discuss in Upcoming Meeting:
No
To discuss in WG10:
No
Short Proposal:
Standard(s):
Needs More Information:
No
Assigned TF:
61850-90-3- conditioned maintenance
Description
In the LN KPMP, there are DO MinOpTmm and MaxOpTmm (CDC ING) to set the minimum and maximum operating times of the pump respectively.
For the LN consistency, two DO of CDC SPS should be added to the LN KPMP for alarming purpose (as it is the case for LN SIML).
Proposal descriptions
Creation of a DO SPS "PmpOpAlm" (Pump operation time alarm) and a DO SPS "PmpIntAlm" (pump intermittent operation alarm) based on MaxOpTmm and MinOpTmm.