Project

General

Profile

IEC61850-7-5 #6407

Schedules - allow 3 values per time point

Added by Vladan Cvejic about 1 year ago.

Status:
New
Priority:
Normal
Assignee:
-
Start date:
03/02/2022
Due date:
09/02/2022 (about 23 months late)
% Done:

100%

Source:
Category:
Not yet categorized
TF 7-5 Project document:
Related TISSUE:

Description

Context: how to use IEC 61850 for DER and microgrids (IEC 61850-90-23 CD1).

Several use cases require schedules or forecasts that have several values for each time point.
Examples include:
- Forecast quantities with nominal, lower bound and upper bound values
- Preferred (ideal) setpoint, minimum and maximum limits
- Operational function set point values and activation modes

Today this is only possible by using several FSCH logical nodes. This has the risk that communication failures may leave the set of FSCH nodes with inconsistent information.

This would also help with mapping to CIM based systems.


Related issues

Copied from IEC 61850 User Feedback Task Force - Improvement #5321: Schedules - allow 3 values per time pointResolved03/02/202209/02/2022

Actions

Also available in: Atom PDF