Project

General

Profile

Feature #597

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection

Added by Herbert Falk almost 4 years ago. Updated over 1 year ago.

Status:
Resolved
Priority:
Normal
Assignee:
-
Category:
Standard clarification required
Start date:
Due date:
% Done:

0%

Estimated time:
ID:
1120
Source:
IOP_2019
TF Unique ID:
1120 # IOP_2019
WG10 Proposal:

- ConfRev in the message serves the purpose that the subscriber/client needs to be reconfigured- Reconfiguration may be dynamic (e.g. a client retrieving from the server the changes)- Based on that – detailed rules need to be defined, in what cases confRev needs to be increased ? this is currently discussed in the TF communication supervisionFeb-20: CRC: Check with Christophe CamelisJun-20: There are still discussions about ConfRev. A NWIP will be launched.

Estimated Completion:
Discuss in Upcoming Meeting:
No
To discuss in WG10:
No
Short Proposal:

SCT must recognize 9-2LE as fixed configuration.

Standard(s):

61850-90-28

Needs More Information:
No
Assigned TF:

Description

SCTs updating the confRev of 9-2 LE Sampled Value streams.
9-2 LE states attribute ConfRev to always have the same value.
Hence, the test tools which inject 9-2LE SV streams wouldn’t allow the user to modify the confRev.

But, the IEDs which do a check on the confRev of SV stream(s) before accepting the to 9-2LE streams wouldn’t subscribe to the SV streams from the test tools as there is a mismatch between the confRev of SV from the test tool (which is 1) and confRev of SV which the IED is expecting (as defind in the SCD).

1. The SCTs shouldn’t increment the confRev of 9-2LE SVs.
2. Suggestion: the IEDs accepting 9-2LE streams should perform a check on the confRev and should declare this in the PIXIT.


Proposal descriptions

Routed to TF 90-28 Communication supervision.

Also available in: Atom PDF