Issues #5875
sGopN2 mandatory?
Status:
Closed
Priority:
Normal
Assignee:
-
Due date:
Discuss in Upcoming Meeting:
Yes
Clause Reference:
61850 Standard:
8-1
Triggering Tissue:
Final Decision:
Initial Test Document:
Updated Test Document:
Test Case ID:
sGopN2
Closed Reason:
No Action Taken
Triggering Tissue 2:
Triggering Tissue 3:
Description
The expected result step 1 states: DUT accepts or does not accept configuration (PIXIT) a dataset exceeding the GOOSE packet size. The test may not be conditional anymore and can be changed to mandatory. A similar case is with sGop9: DUT/ICT accepts or does not accept a GCB with empty dataset. sGop9 is mandatory.
Condition is: PIXIT-Gp9 Dataset too large: sGopN2
PIXIT-Gp9: Does Server or ICT refuse GOOSE payload dataset length greater than SCSM supports?
One reason to keep it conditional is that the ICT/SCT can't create a "too" large dataset because the number of dataset elements is limited so the ICT prevents this situation.
Updated by IEC 61850 TPWG over 2 years ago
- Status changed from New to Closed
- Closed Reason No Action Taken added
- Closed Reason deleted (
--Not Set---)
Keep conditional - no change