CIM Issues #5845

Propose Flexible Ramping Up (FRU or RampUp) and Flexible Ramping Down (FRD or RampDown). Update descriptions of all enum values.

Added by Herbert Falk over 2 years ago. Updated over 2 years ago.

Status:
Closed
Priority:
Normal
Author/Contact Info:
Becky
Base Release:
iec61970cim17v34_iec61968cim13v12_iec62325cim04v08
Solution to be Applied To:
Solution Version:
iec61970cim17v34_iec61968cim13v12_iec62325cim04v11
Solution Applied By:
BLI
Completion Date:
03/03/2022
CIM Keywords:
Breaking Change:
Breaking Change Description:
CIM Impacted Groups:
None
Requestor:
Standard(s):
Version:
Clause:
MarketProductType enum values
Sub-Clause:
Paragraph:
Table:
Originally Closed in Version:
Origination Date:
01/21/2022
Origination ID:
16_0129
Originally Assigned To:

Description

Propose Flexible Ramping Up (FRU or RampUp) and Flexible Ramping Down (FRD or RampDown). Update descriptions of all enum values.


Proposed Solution

Propose the following updated descriptions for the enums:
EN: Energy generally priced per kWh or MWh
LFU: Load following up (power injection) generally priced per kW or MW
LFD: Load following down (power withdrawl) generally priced per kW or MW
RU: Frequency Regulation Service (energy injection)
RD: Frequency Regulation Service (energy withdrawl)
REG: Frequency Regulation Service (injection and/or withdrawl)
SR: Spinning Reserve or Contingency Reserve generally priced per kWh or MWh
NR: Non-spinning Reserve or Replacement Reserve generally priced per kWh or MWh
RC: Residual Unit Commitment (Resources with available capacity for a forward market such as Day Ahead. An award indicates they are needed for resource adequacy (i.e. reliability) purposes.)
RPU: RampUp: Power injection generally priced per kW or MW
RPD: RampDown: Power withdrawl generally priced per kW or MW
RMU: Regulation Mileage Up
RMD: Regulation Mileage Down
PL: Power Limit (see use case from Peter F. "Use Case Power Limit.docx")


Decision

3/3/2022: Team agreed to use the updated descriptions, adding the new enums RPU, RPD, RMU, RMD.

Request Peter to attend an upcoming call to address the Power Limit use case as a market product. Pull this use case to a new issue. 16_0141

#1

Updated by Becky Iverson over 2 years ago

  • Status changed from New to Closed
  • Proposed Solution updated (diff)
  • Decision updated (diff)