551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
6714 IEC TC57 WG10 Future Work WG10 Future Work IEC PAS 61850-90-3 New Normal Improve the models used for power regulation 02/20/2024 11:04 AM Actions
6703 IEC TC57 WG10 Future Work WG10 Future Work Ed 3 review New Normal

IEC 61850-7-4, IEC TS 61850-80-4

Part 80-4 Mapping to COSEM : add reactive and apparent energy data objects to MMTR and MMTN 02/09/2024 02:43 PM Actions
6701 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-3

Integration of proposed and canceled amendment 2 of part 7-3 02/08/2024 05:25 AM Actions
6700 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

Investigate to align to the new CIM model of transformers 02/08/2024 05:26 AM Actions
6613 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-6

IEC61850 Tissue 1833: Service SettingGroups.ConfSG clarification 02/08/2024 01:38 AM Actions
6604 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 02/08/2024 01:42 AM Actions
6578 IEC TC57 WG10 Future Work WG10 Future Work TF 61850-80-6 New Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 02/08/2024 01:50 AM Actions
6561 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Modeling of primary equipment 10/26/2023 04:20 AM Actions
6524 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/670 - enable/disable LN via setting / new DO SetMod 10/26/2023 03:54 AM Actions
6441 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-14

Extensions to "Z" Logical Nodes (e.g. ZBAT) 10/26/2023 04:10 AM Actions
6432 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-30

SCL Engineering Lifecycle, Types and Security for SCL files and Elements 10/26/2023 04:26 AM Actions
6429 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

IEC 61850-7-4xx

Logical Node Groups with Dedicated Namespaces 10/26/2023 04:28 AM Actions
6427 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-3

New Logical Nodes - Battery Charger 10/26/2023 04:31 AM Actions
6423 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TS IEC 61850-80-7

SCL Control Block 10/26/2023 04:32 AM Actions
6419 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal Logical Nodes for SLD/Topology Aware Functions 02/09/2024 04:55 AM Actions
6417 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-4

SCL Modelling of the Communication Network and All its Components 10/26/2023 04:40 AM Actions
6412 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

IEC 61850-7-3

Improved SCL Modelling of Function Inputs (InRef/ExtRef) 10/26/2023 04:41 AM Actions