IEC 61850 Certificate #7064
SA-OPD
Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Client
Company:
DONGWOO ELECTRIC CORP
Address:
34, Oseongseo-ro, Anjung-eup, Pyeongtaek-si, Gyeonggi-do, Republic of Korea, 17928
Product:
DWSA-OP
HW Version:
1.0/ HP Z2 Tower G9 Workstation
SW Version:
1.0/ Windows Server 2019
Key Words:
Test Procedure Version:
1.2
IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Control Block (9), SBO Control (12b), Service Tracking (B15), Setting Group (B4), Setting Group Definition (B4+), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
11/27/2024
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Korea Testing Laboratory (A)
Test Document:
Certificate Name:
24-045122-01-2_DongWoo_DWSA-OP_Client_Ed2.0_Certification_KTL.pdf
Certificate Hash:
SHA256: 4C1264E677DC8F362D711D75472EBD8ABBBC31485E8B50962EB956012E6FDFF7
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
DWSA-OP-2024-001
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-
Product Variants:
Time Activated Control:
No
Description
Substation Automation Operation Processing Device
Files
Related issues