Project

General

Profile

Issues #6792

Discrepancies between certificate tables and testprocedures - client testprocedure

Added by Andreas Hetz about 2 months ago. Updated about 1 month ago.

Status:
Resolved
Priority:
High
Due date:
06/11/2024 (35 days late)
Discuss in Upcoming Meeting:
Yes
Clause Reference:
61850 Standard:
8-1
Triggering Tissue:
Final Decision:
Initial Test Document:
Updated Test Document:
Test Case ID:
Closed Reason:
--Not Set---
Triggering Tissue 2:
Triggering Tissue 3:

Description

UCATestProceduresClient61850-8-1_Ed2Amd1_Rev1p0.pdf shows discrepancies in the certificate table. Specifically, for BRCB, the procedure does not include cBr33, but the certificate table does. Therefore, (ends up to 31/31 instead of 32/32 by excluding cBr33).

Similarly, for 12b SBO and 14 FileTransfer, M4 and cFt6 are included in the procedure but not in the certificate table.

I believe that the table in the procedure should be corrected to reflect these discrepancies accurately.

https://www.ucaiug.org/org/TechnicalO/Testing/UCAIug%20Testing%20Quality%20Assurance%20Program/Current%20IEC%2061850%20Edition%202%20Testing%20Procedures/UCATestProceduresClient61850-8-1_Ed2Amd1_Rev1p0.pdf

Since this came up in an ongoing accreditation, I also would like to request an answer from the working group in the next meeting.

#1

Updated by Andreas Hetz about 2 months ago

  • Subject changed from Discrepancies between certificate tables and testprocedures to Discrepancies between certificate tables and testprocedures - client testprocedure
#2

Updated by Richard Schimmel about 2 months ago

I agree to:
- remove cB33 from the certificate template (total 31)
- add cFt6 to the certificate template as conditional (total 8)
- don't know M4?? in 12b

#3

Updated by IEC 61850 TPWG about 2 months ago

  • Due date set to 06/11/2024
  • Status changed from New to In Progress

Needs clarification on M4, otherwise accepted.

#4

Updated by Richard Schimmel about 2 months ago

  • Initial Test Document set to Ed2 Amd1 TP1.0

Found it; cSBOns10 was missing on the certificate template as mandatory

#5

Updated by Richard Schimmel about 1 month ago

Solution:
- remove cB33 from the certificate template (total 31)
- add cFt6 to the certificate template as mandatory (total 8)
- add cSBOns10 to the certificate template as mandatory (total 12)

#6

Updated by IEC 61850 TPWG about 1 month ago

  • Status changed from In Progress to Resolved
  • Assignee set to Richard Schimmel

Also available in: Atom PDF