Project

General

Profile

CIM Issues #5764

Clean up of RegisteredInterTie attributes

Added by Herbert Falk over 2 years ago. Updated about 2 years ago.

Status:
Open
Priority:
Normal
Author/Contact Info:
Becky
Base Release:
iec61970cim17v04iec61968cim12v09iec62325cim03v08
Solution to be Applied To:
Solution Version:
Solution Applied By:
Completion Date:
CIM Keywords:
Breaking Change:
Breaking Change Description:
CIM Impacted Groups:
None
Requestor:
Standard(s):
Version:
Clause:
RegisteredInterTie
Sub-Clause:
Paragraph:
Table:
Originally Closed in Version:
Origination Date:
03/17/2016
Origination ID:
16_0048
Originally Assigned To:

Description

Clean up of RegisteredInterTie attributes


Proposed Solution

Direction Cleanup description - Done
energyProductType Is the specification of FIRM/NFIRM from the contract or does it determine fixed or dispatchable based on price? Verify with Projects.
isDynamicInterchange Check to see if this is more of a registration characteristic rather than the definition of the RegisteredInterTie as selected from energyProductType.
minHourlyBlockLimit Update descripion to explain the use of the minimum hourly block limit.

Also available in: Atom PDF