CIM Issues #5002
Updated by Todd Viegut 3 months ago
19-Sep-2024 Joint TF Hybrid Meetings:
Reviewed. In CIM18v12 we have addressed all the forecasting properties needed what is missing is the method for creating a curve based on real-time measured temperature on the cable versus the flow on the line and other environmental measurements.
AI: Svein will make a proposal.