WG10 Future Work #6417
Updated by Vladan Cvejic about 1 year ago
In principle, there is capability to describe all relevant equipment in the network.
To reinitiate 90-4 and recheck these aspects (if there is a need to do the conversion of SNMP existing model into 61850 model).
To look what is already covered by 90-22.