Project

General

Profile

WG10 Future Work #6417

Updated by Vladan Cvejic about 1 year ago

In principle, there is capability to describe all relevant equipment in the network. 
 To reinitiate 90-4 and recheck these aspects (if there is a need to do the conversion of SNMP existing model into 61850 model). 
 To look what is already covered by 90-22.

Back