Project

General

Profile

IEC 61850 Certificate #7184

PCS-9799S STATION MANAGER

Added by Herbert Falk 10 days ago. Updated 10 days ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2 Amd 1
61850 Tested Aspects:
Client
Company:
NR Electric Co., Ltd.
Address:

69 Suyuan Avenue, Jiangning, 211102 Nanjing, PEOPLE’S REPUBLIC OF CHINA

Product:
PCS-9799S STATION MANAGER
HW Version:
SW Version:
1.00
Key Words:
Test Procedure Version:

1.0

IEC 61850 Blocks Certified:
Basic Exchange (B1a), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Control Block (9), SBO Control (12b), Setting Group (B4), Setting Group Definition (B4+), Substitution (B3), Time sync PTP (B13b), Time sync SNTP (B13a), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
04/26/2025
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
TUV SUD China Ltd (A)
Certificate Name:
D 061589 0210_NREC_PCS-9799S_IEC61850Ed2.1_Client_Certificate.pdf
Certificate Hash:
SHA256: 486D7C1B3B7A62497AB45A968F5C9CA86960FE86FCD83BF725AD06BB8CF6DB86
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
NRJB2000002413940
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-
Product Variants:
Time Activated Control:
No

Description

PCS-9799S serves as a station level gateway, which collects, processes and stores signals of relays, measurement units, control units and other IEDs in substation, and transfers them to higher-level systems such as remote control center and distributed control system.


Files

Also available in: Atom PDF