IEC 61850 Certificate #6754
N60
Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Server
Company:
GE Renewable Energy Ltd.
Address:
St. Leonards Building, Harry Kerr Drive
Stafford, ST16 1WT
United Kingdom
Product:
N60
HW Version:
SW Version:
8.51
Key Words:
Test Procedure Version:
2.0.6
IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Setting Group (B4), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
04/07/2024
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Grid Automation Laboratories (B)
Test Document:
Certificate Name:
50745.6UR.808_GE_N60_8.51_Ed2_Certificate.pdf
Certificate Hash:
SHA256: AB2B797552326E4662772579227284E3C82495C9CB729EB1BBD7FDD5D10C6E45
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
S/N AAIC15000574
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-
Product Variants:
UR B30
Time Activated Control:
Description
GE Multilin N60 Network Stability and Synchrophasor Measurement System
Files