Project

General

Profile

IEC61850-7-5 #6395

Figure 15 SelOpn and SelCls are incorrect

Added by Keith Gray over 1 year ago. Updated 10 months ago.

Status:
Waiting for Release
Priority:
Normal
Assignee:
-
Start date:
06/14/2023
Due date:
% Done:

0%

Source:
Category:
Document Error
TF 7-5 Project document:
IEC 61850-7-500
Related TISSUE:

Description

I found an inconsistency in SelOpn and SelCls definitions between IEC 61850-7-500 Ed2 and 61850-7-4 Ed2.1. Can we discuss this during today’s meeting if time permits?

Figure 15 in 61850-7-500 shows SelOpn and SelCls with per-phase data attributes (as if it were an ACT). However, 61850-7-4 Ed2.1 defines SelOpn and SelCls as SPS. Even for single-phase control, the selection has to be per-switch. I believe this diagram needs to be updated.

Thanks,

Priyanka Nadkar
Development Lead Engineer
Research and Development
Schweitzer Engineering Laboratories
901 Center Park Drive, Charlotte, NC 28217 USA | Office: (704)-504-6804

#1

Updated by Michael Haecker over 1 year ago

Confirm the copy-and-paste error.
Drawing modified, ready for use in Ed.2 of this document.

#2

Updated by Keith Gray over 1 year ago

  • TF 7-5 Project document IEC 61850-7-500 added
#3

Updated by Keith Gray over 1 year ago

  • Status changed from New to In Progress

Michael has the correct drawing from the original work. He has updated 7-500 and will send the update to Keith. Keith will organize these updated files in the collaboration platform as we prepare to update the official version of 7-500.

#4

Updated by Keith Gray 10 months ago

I have replaced the diagram in the document in preparation for the 2024/02/28 TF meeting.

#5

Updated by Keith Gray 10 months ago

  • Status changed from In Progress to Waiting for Release

Reviewed during the 2024/02/29 TF meeting

Also available in: Atom PDF