Project

General

Profile

IEC 61850 Certificate #5071

ENCS-3m.648-1-3 [Engineering Center Energoservice]

Added by Bruce Muschlitz about 3 years ago. Updated about 3 years ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Server
Company:
Engineering Center Energoservice
Address:

44, Aviamotornaya street, Bld 1
Office 1A, Room 1
Moscow, 111024
Russian Federation

Product:
ENCS-3m.648-1-3
HW Version:
SW Version:
1.4.7
Key Words:
Meter, RTU
Test Procedure Version:
IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Bruce.Muschlitz
Approval Date:
09/07/2021
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
DNV Netherlands (A)
Test Document:
Certificate Name:
10300969-INC 21-3227
Certificate Hash:
CCCE560EE16F9805EEE328498A2390A263E016D35669A7DDF5F0D9637CC6D5FC
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Energoservice
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:
Product Variants:
Time Activated Control:

Description

Remote terminal unit
With Smart meter ESM and IO Module ENMV-1


Files

Also available in: Atom PDF