IEC 61850 Certificate #2977
Multilin G500 Advanced Substation Gatewa [GE Multilin]
Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Client
Company:
GE Multilin
Address:
650 Markland St.
Markham, ON L6C 0M1
Canada
Product:
Multilin G500 Advanced Substation Gatewa
HW Version:
G500-B
SW Version:
G500 v2.10
Key Words:
Gateway
Test Procedure Version:
1.1.2(rev2
IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), SBO Control (12b), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
bruce.muschlitz
Approval Date:
01/08/2021
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Grid Automation Laboratories (B)
Test Document:
Certificate Name:
50745.6G500.801
Certificate Hash:
7AE784BF53D1E50C0975C536C3AED53BD9FD32B00B30793ED055C77D19FD5B99
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:
Product Variants:
Time Activated Control:
Description
This certificate and its information was migrated from a previous database
Files
Updated by Herbert Falk over 3 years ago
- File 50745.6G500.801_GE_Multilin_G500_Gateway_V2.10_Edition2_Client_Certifi added
Updated by Herbert Falk over 3 years ago
- Address updated (diff)
- Optional Reservation Test changed from No to Yes
Updated by Herbert Falk over 3 years ago
- File deleted (
50745.6G500.801_GE_Multilin_G500_Gateway_V2.10_Edition2_Client_Certifi)
Updated by Herbert Falk over 3 years ago
- Current Test Lab Name changed from UK Grid Solutions Ltd (B) to Grid Automation Laboratories (B)