Project

General

Profile

IEC 61850 Certificate #2738

UR N60 Network Stability and Synchrophas [GE Grid Automation]

Added by Herbert Falk over 3 years ago. Updated over 3 years ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 1
61850 Tested Aspects:
Server
Company:
GE Grid Automation
Address:

650 Markland St.
Markham, ON L6C OM1, Canada

Product:
UR N60 Network Stability and Synchrophas
HW Version:
SW Version:
7.70
Key Words:
Protection, Relay
Test Procedure Version:

3.2

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Setting Group (B4), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
bruce.muschlitz
Approval Date:
06/19/2018
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Grid Automation Laboratories (B)
Test Document:
Certificate Name:
50745.6UR.803
Certificate Hash:
49238BD39E12F421CCD9D4B237593ED9319126D969735CAE550D0D9DA6DA35F3
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:
Product Variants:
Time Activated Control:

Description

This certificate and its information was migrated from a previous database


Files

#2

Updated by Herbert Falk over 3 years ago

  • Current Test Lab Name changed from UK Grid Solutions Ltd (B) to Grid Automation Laboratories (B)

Also available in: Atom PDF