IEC 61850 Certificate #2737
UR N60 Network Stability and Synchrophas [GE Grid Automation]
Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Server
Company:
GE Grid Automation
Address:
650 Markland St.
Markham, ON L6C OM1, Canada
Product:
UR N60 Network Stability and Synchrophas
HW Version:
SW Version:
7.70
Key Words:
Protection, Relay
Test Procedure Version:
1.0
IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Setting Group (B4), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
bruce.muschlitz
Approval Date:
06/19/2018
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Grid Automation Laboratories (B)
Test Document:
Certificate Name:
50745.6UR.802
Certificate Hash:
0EE0DF4E650E437A8B0D8BA0A31D8EF6EEE3197EA86CC7A5460ECDEDC26C2E51
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:
Product Variants:
Time Activated Control:
Description
This certificate and its information was migrated from a previous database
Files
Updated by Herbert Falk over 3 years ago
Updated by Herbert Falk over 3 years ago
- Current Test Lab Name changed from UK Grid Solutions Ltd (B) to Grid Automation Laboratories (B)