IEC 61850 Certificate #2590
UNT-EAP Main Unit of Arc Protection [BAODING UNT ELECTRIC CO., LTD.]
Status:
Approved
Priority:
Normal
61850 Edition:
Edition 1
61850 Tested Aspects:
Server
Company:
BAODING UNT ELECTRIC CO., LTD.
Address:
No.2777, Xiangyang North Street, Baoding, Hebei,
P.R.China
Product:
UNT-EAP Main Unit of Arc Protection
HW Version:
SW Version:
V1.00
Key Words:
Protection
Test Procedure Version:
3.03
IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced SBO Control (12d), Setting Group (B4), Setting Group Definition (B4+), Substitution (B3), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
bruce.muschlitz
Approval Date:
01/20/2017
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Xuchang KETOP Testing Research Institute Co.(A)
Test Document:
Certificate Name:
2016PUCA0040
Certificate Hash:
828FA6FBDFA35DB523CACCCC233809726A9009B1297659E13789B095E0360B32
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:
Product Variants:
Time Activated Control:
Description
This certificate and its information was migrated from a previous database
Files