Project

General

Profile

IEC 61850 Certificate #2412

Schneider MiCOM P645 [Schneider Electric Infrastructure Business China]

Added by Herbert Falk about 3 years ago. Updated about 3 years ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 1
61850 Tested Aspects:
Server
Company:
Schneider Electric Infrastructure Business China
Address:

Building 6B/C, F Block, No. 188, Xinjun Ring Rd.
Pujiang Hi-Tech Park, Minhang District , Shanghai

Product:
Schneider MiCOM P645
HW Version:
K
SW Version:
04V
Key Words:
Protection, Relay
Test Procedure Version:

2.3

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Setting Group (B4), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
kathy.ellis
Approval Date:
09/18/2015
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Schneider-Electric China (B)
Test Document:
Certificate Name:
VAL_P645_04V
Certificate Hash:
59B3F3BEBBEA93F6D3EE2021CAD5EEACC07BC2A3CA2681C915EF74E28E9E9B8F
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Schneider Electric
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:
Product Variants:

Description

This certificate and its information was migrated from a previous database


Files

#2

Updated by Herbert Falk about 3 years ago

  • Umbrella Organization set to Schneider Electric

Also available in: Atom PDF