Project

General

Profile

IEC 61850 Certificate #2398

MiCOM P741 [Schneider Electric]

Added by Herbert Falk over 3 years ago. Updated over 3 years ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 1
61850 Tested Aspects:
Server
Company:
Schneider Electric
Address:

No. 3/86-E, Ambattur Industrial Estate,
Ambattur, Chennai - 600 058, India

Product:
MiCOM P741
HW Version:
K
SW Version:
51
Key Words:
Protection
Test Procedure Version:

2.3

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Setting Group (B4), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
kathy.ellis
Approval Date:
09/17/2015
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Central Power Research Institute India (A)
Test Document:
Certificate Name:
UARC/PL/C0062/2012
Certificate Hash:
884201BD010795F3D6C043AC070BC32C8AF76DF57C8FB79E0A749227A6E3F372
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Schneider Electric
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:
Product Variants:
Time Activated Control:

Description

This certificate and its information was migrated from a previous database


Files

Also available in: Atom PDF