Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
611 IEC 61850 User Feedback Task Force Bug 5 RTE In Progress Normal

IEC 61850-7-4 / IEC 61850-80-6

Need a new DO (ENUM) to identify the protocol used for the SCADA exchange, in LN ITCI 05/11/2021 09:59 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall In Progress High

IEC 61850-6

How to add utility process name to DOs 02/11/2021 06:37 AM Actions
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 11/23/2021 08:34 AM Actions
442 IEC 61850 User Feedback Task Force Bug 5 Vattenfall Resolved High

IEC 61850-6-100

Maping LNode (substation section) to LN (IED section) 03/15/2022 09:10 AM Actions
5336 IEC 61850 User Feedback Task Force Feature 4 TF 61850-80-6 In Progress Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 04/26/2022 09:20 AM Actions
5124 IEC 61850 User Feedback Task Force Feature 3 TF 61850-80-6 In Progress Normal

IEC 61850-80-6

Telemonitoring blocking 12/21/2021 09:26 AM Actions
5091 IEC 61850 User Feedback Task Force Feature 10 H30 In Progress Normal

IEC 61850-2

Devices types/acronyms 02/09/2022 10:30 AM Actions
677 IEC 61850 User Feedback Task Force Feature 50 RTE In Progress Normal

IEC 61850-7-4

Impact of IEC 61869-13 (SAMU) 06/21/2022 02:04 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
621 IEC 61850 User Feedback Task Force Feature 17 RTE In Progress Normal

IEC 61850-7-4/7-500

New controllable DO in RREC to define the mode of the recloser of the circuit breaker 05/11/2021 10:08 AM Actions
608 IEC 61850 User Feedback Task Force Feature 7 H30 In Progress Normal

IEC 61850-90-xx

Comprehensive set of requirements covering validation and supervision of all IEC 61850 communications 06/21/2022 02:09 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 In Progress Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 07/05/2022 08:30 AM Actions
578 IEC 61850 User Feedback Task Force Feature 50 ENTSO-E In Progress Normal

IEC 61850-7-4

Busbar protection: End Fault protection - model definition required. 02/11/2021 07:10 AM Actions
576 IEC 61850 User Feedback Task Force Feature 48 ENTSO-E In Progress Normal

IEC 61850-7-4

Distance protection: Distance protection - 1 phase and 3 phase zone extension signals are missing 02/11/2021 07:11 AM Actions
575 IEC 61850 User Feedback Task Force Feature 47 ENTSO-E In Progress Normal

IEC 61850-7-4

Protection scheme: Reversal current logic LN/DO/DA missing 02/11/2021 07:13 AM Actions
574 IEC 61850 User Feedback Task Force Feature 46 ENTSO-E In Progress Normal

IEC 61850-7-4

Protection scheme: Weak end infeed (1 phase and 2/3 phase operate missing) 02/11/2021 07:13 AM Actions
573 IEC 61850 User Feedback Task Force Feature 45 ENTSO-E In Progress Normal

IEC 61850-7-4

Tap Changer Supervision: Tap discrepancy (3 pole transformer case) 02/11/2021 07:14 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall In Progress Normal

IEC 61850-6 (-100)

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 02/11/2021 07:59 AM Actions
409 IEC 61850 User Feedback Task Force Feature 4.1 ENTSO-E In Progress Normal Too loose or non existing guideline for organization of structure tree (construction of each LD, LN etc) 02/11/2021 08:00 AM Actions
5331 IEC 61850 User Feedback Task Force Feature SCL IOP 2021 Resolved Normal

IEC 61850-6

Multiple LNodes implemented by same LN 03/29/2022 09:14 AM Actions
5123 IEC 61850 User Feedback Task Force Feature 2 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

ACSI service for link supervision on application level 06/21/2022 08:35 AM Actions
5122 IEC 61850 User Feedback Task Force Feature 1 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

New LN in LN group L to reflect the status of TPAA between Proxy/Gateway and IED 02/09/2022 07:06 AM Actions
5088 IEC 61850 User Feedback Task Force Feature 12 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 8/8 02/14/2022 03:56 AM Actions
5087 IEC 61850 User Feedback Task Force Feature 11 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 7/8 02/14/2022 03:55 AM Actions
5086 IEC 61850 User Feedback Task Force Feature 10 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 6/8 02/14/2022 03:56 AM Actions
(1-25/1818) Per page: 25, 50, 100