# Project Tracker ID Source Status Priority Standard(s) Subject Updated
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
620 IEC 61850 User Feedback Task Force Feature 16 RTE Triage Normal New LN LPDO / LPDI in IEC 61850-7-5 06/20/2022 03:55 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 03/02/2021 09:29 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 07/05/2022 08:48 AM Actions
409 IEC 61850 User Feedback Task Force Feature 4.1 ENTSO-E In Progress Normal Too loose or non existing guideline for organization of structure tree (construction of each LD, LN etc) 02/11/2021 08:00 AM Actions
660 IEC 61850 User Feedback Task Force Support 1 WG10 In Progress Normal IED model documentation 06/16/2021 09:32 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Triage Normal Link Failover reliability problem - implication to protection application 02/09/2022 09:13 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 12/21/2021 08:56 AM Actions
434 IEC 61850 User Feedback Task Force Support 25 ENTSO-E In Progress Normal Freedom of choice what IEC 61850 services are to be tested seem too open. The vendor can select exactly what UCA accredited test 04/02/2021 01:30 PM Actions
5926 General Testing Issues Improvement New Normal Review ICT TP 08/09/2022 10:12 AM Actions
5921 General Testing Issues Improvement New Normal Start using Vendor and Lab Submission Information 08/09/2022 10:20 AM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
673 IEC 61850 User Feedback Task Force Improvement 47 RTE Resolved Normal CPU monitoring 09/29/2021 03:50 AM Actions
5948 Server Issues New Normal sSvp22 detail is missing in TP1.2 (editorial) 08/16/2022 06:23 AM Actions
5917 Server Issues In Progress Urgent 'Expected result' for some test cases of CB9b: GOOSE subscribe 08/09/2022 10:21 AM Actions
5914 Server Issues In Progress Normal Verify that LPHD.Sim is not affected by LLN0.Beh 08/09/2022 08:59 AM Actions
5913 Server Issues Resolved Normal sSrvN1e and sSrvN3 change condition SCL FC=CF/DC/SP with valKind=Set 08/09/2022 08:48 AM Actions
5912 Server Issues In Progress Normal sSrv6 checking the read-only part is always applicable 08/09/2022 08:47 AM Actions
5910 Server Issues In Progress Normal Need to test that IEDs support 1 Step and 2 Step clocks: IOP 2022 08/09/2022 08:30 AM Actions
5907 Server Issues Resolved Normal sCtl26 - Cancel a direct control object 08/09/2022 08:24 AM Actions
5906 Server Issues Rejected Normal sCnf51 at least one LPHD 08/11/2022 01:55 AM Actions
5905 Server Issues In Progress Normal sSrvN4 is mandatory, used SetDataValues service is optional in PICS and may not be not supported 08/09/2022 08:20 AM Actions
5371 Server Issues Resolved Normal Scope of the test is limited to a given NSD release. 06/29/2022 02:11 AM Actions
5362 Server Issues Resolved Normal sGop2 and sGop4 check minimum MinTime and minimum MaxTime 08/09/2022 08:45 AM Actions