Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall In Progress High

IEC 61850-6

How to add utility process name to DOs 02/11/2021 06:37 AM Actions
442 IEC 61850 User Feedback Task Force Bug 5 Vattenfall Resolved High

IEC 61850-6-100

Maping LNode (substation section) to LN (IED section) 03/15/2022 09:10 AM Actions
611 IEC 61850 User Feedback Task Force Bug 5 RTE In Progress Normal

IEC 61850-7-4 / IEC 61850-80-6

Need a new DO (ENUM) to identify the protocol used for the SCADA exchange, in LN ITCI 05/11/2021 09:59 AM Actions
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 11/23/2021 08:34 AM Actions
409 IEC 61850 User Feedback Task Force Feature 4.1 ENTSO-E In Progress Normal Too loose or non existing guideline for organization of structure tree (construction of each LD, LN etc) 02/11/2021 08:00 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall In Progress Normal

IEC 61850-6 (-100)

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 02/11/2021 07:59 AM Actions
573 IEC 61850 User Feedback Task Force Feature 45 ENTSO-E In Progress Normal

IEC 61850-7-4

Tap Changer Supervision: Tap discrepancy (3 pole transformer case) 02/11/2021 07:14 AM Actions
574 IEC 61850 User Feedback Task Force Feature 46 ENTSO-E In Progress Normal

IEC 61850-7-4

Protection scheme: Weak end infeed (1 phase and 2/3 phase operate missing) 02/11/2021 07:13 AM Actions
575 IEC 61850 User Feedback Task Force Feature 47 ENTSO-E In Progress Normal

IEC 61850-7-4

Protection scheme: Reversal current logic LN/DO/DA missing 02/11/2021 07:13 AM Actions
576 IEC 61850 User Feedback Task Force Feature 48 ENTSO-E In Progress Normal

IEC 61850-7-4

Distance protection: Distance protection - 1 phase and 3 phase zone extension signals are missing 02/11/2021 07:11 AM Actions
578 IEC 61850 User Feedback Task Force Feature 50 ENTSO-E In Progress Normal

IEC 61850-7-4

Busbar protection: End Fault protection - model definition required. 02/11/2021 07:10 AM Actions
584 IEC 61850 User Feedback Task Force Feature 1122 IOP_2019 Resolved Normal

IEC 61850-6

SCL validation - Should all name parts of PhV be contained in the doName? 07/05/2022 08:20 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 In Progress Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 07/05/2022 08:30 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

TF Communication supervision

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 09/26/2022 09:55 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 07/05/2022 08:48 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 07/05/2022 08:52 AM Actions
608 IEC 61850 User Feedback Task Force Feature 7 H30 In Progress Normal

IEC 61850-90-xx

Comprehensive set of requirements covering validation and supervision of all IEC 61850 communications 06/21/2022 02:09 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 07/05/2022 08:17 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 03/02/2021 09:29 AM Actions
620 IEC 61850 User Feedback Task Force Feature 16 RTE Triage Normal New LN LPDO / LPDI in IEC 61850-7-5 06/20/2022 03:55 AM Actions
621 IEC 61850 User Feedback Task Force Feature 17 RTE In Progress Normal

IEC 61850-7-4/7-500

New controllable DO in RREC to define the mode of the recloser of the circuit breaker 05/11/2021 10:08 AM Actions
622 IEC 61850 User Feedback Task Force Feature 18 RTE Triage Normal

IEC 61850-7-4

Parameters not available in standardized LN 06/20/2022 03:56 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 03/02/2021 09:53 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
(1-25/1818) Per page: 25, 50, 100

Also available in: Atom CSV PDF