Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
6428 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Urgent

IEC 61850-6

Next Steps with IEC 61850-90-11 (Publish versus Corrigenda) 10/26/2023 02:47 AM Actions
6422 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Urgent

IEC 61850-7-4xx

Consistent Handling of Abbreviations for Data Object Names Within/Across All Domains and Namespaces 10/26/2023 02:52 AM Actions
6420 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop In Progress Urgent

IEC 61850-6, IEC 61850-7-x, IEC 61850-8-1, IEC 61850-9-2

Validation of SCL Files Using Object Constraint Language (OCL) 10/26/2023 02:57 AM Actions
6414 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop In Progress Urgent Golden Single Line Diagram For All SCL/GCL/HCL Examples 10/26/2023 02:58 AM Actions
6411 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Urgent

TR IEC 61850-7-500, TR IEC 61850-90-3

Update the Model of Circuit Breaker/Disconnector Switch 10/26/2023 03:08 AM Actions
6439 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New High Inter-substation GOOSE Naming convention (90-1) 10/26/2023 03:42 AM Actions
6437 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New High

TR IEC 61850-7-5

Logical Device Inheritance Rules for LocSta 10/26/2023 03:43 AM Actions
6143 IEC TC57 WG10 Future Work WG10 Future Work New High

TR IEC 61850-7-500, TR IEC 61850-90-3

Update the Switchgear / Breaker Model 10/26/2023 03:50 AM Actions
6524 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/670 - enable/disable LN via setting / new DO SetMod 10/26/2023 03:54 AM Actions
6441 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-14

Extensions to "Z" Logical Nodes (e.g. ZBAT) 10/26/2023 04:10 AM Actions
6561 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Modeling of primary equipment 10/26/2023 04:20 AM Actions
6432 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-30

SCL Engineering Lifecycle, Types and Security for SCL files and Elements 10/26/2023 04:26 AM Actions
6429 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

IEC 61850-7-4xx

Logical Node Groups with Dedicated Namespaces 10/26/2023 04:28 AM Actions
6427 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-3

New Logical Nodes - Battery Charger 10/26/2023 04:31 AM Actions
6423 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TS IEC 61850-80-7

SCL Control Block 10/26/2023 04:32 AM Actions
6417 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-4

SCL Modelling of the Communication Network and All its Components 10/26/2023 04:40 AM Actions
6412 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

IEC 61850-7-3

Improved SCL Modelling of Function Inputs (InRef/ExtRef) 10/26/2023 04:41 AM Actions
6410 IEC TC57 WG10 Future Work WG10 Future Work UCA Test. Committee New Normal

IEC 61850-7-2

SBOns to be deprecated in future. 10/26/2023 04:42 AM Actions
6358 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850

IEC 61850-7-4 list of abbreviations 10/26/2023 04:56 AM Actions
6319 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

maxAttributes - conflicting requirements between GOOSE and reporting 10/26/2023 04:58 AM Actions
6316 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 10/26/2023 04:58 AM Actions
6220 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - opDITmms, DITmms 10/26/2023 05:00 AM Actions
6185 IEC TC57 WG10 Future Work WG10 Future Work 2022 IOP New Normal

IEC 61850-6

SCL Need to differentiate the difference in the number of GOOSE vs R-GOOSE 10/26/2023 05:01 AM Actions
6165 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1844 - Implementation of SumSwARs in 3-phase circuit breaker inaccurate 10/26/2023 05:01 AM Actions
6164 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1825 - Permission mode for control/setting of a scheduled entity from a client 10/26/2023 05:03 AM Actions
6163 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-5

https://iec61850.tissue-db.com/tissue/1804 - When e.g. LocSta = false, result of command to switch DO Mod with "station-control" not clear. 10/26/2023 05:06 AM Actions
6162 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1803 - Mechanical Blocking of 3 way switches 10/26/2023 05:07 AM Actions
6161 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-5

https://iec61850.tissue-db.com/tissue/1797 - SwModKey dependency of CSWI from LLN0 10/26/2023 05:08 AM Actions
6160 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-90-29

https://iec61850.tissue-db.com/tissue/1796 LPHD.PwrSupAlm as Omulti 10/26/2023 05:13 AM Actions
6159 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-90-3

https://iec61850.tissue-db.com/tissue/1789 SCBR - Coilxxx-Data-Objects shall be Omulti 10/26/2023 05:14 AM Actions
6158 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1760 - OMulti for MMET data objects 10/26/2023 05:14 AM Actions
6156 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-3

https://iec61850.tissue-db.com/tissue/1748 Arrays of CDC 10/26/2023 05:15 AM Actions
6155 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1706 Missing LN for Miniature Circuit Breaker (MCB) 10/26/2023 05:19 AM Actions
6154 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1698 AnOut in GAPC 10/26/2023 05:19 AM Actions
6153 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1691 Contradictory statement for Mod.stVal 10/26/2023 05:19 AM Actions
6151 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-3

Use and configuration of ORG within the scope of InRef 7 BlkRef 10/26/2023 05:20 AM Actions
6144 IEC TC57 WG10 Future Work WG10 Future Work IOP 2022 New Normal

IEC 61850-6

Need to add SCL mechanism to define a minimum MinTime 10/26/2023 05:21 AM Actions
6613 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-6

IEC61850 Tissue 1833: Service SettingGroups.ConfSG clarification 02/08/2024 01:38 AM Actions
6604 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 02/08/2024 01:42 AM Actions
6578 IEC TC57 WG10 Future Work WG10 Future Work TF 61850-80-6 New Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 02/08/2024 01:50 AM Actions
6448 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Urgent

TR IEC 61850-7-5

GOOSE treatment as a command 02/08/2024 01:53 AM Actions
6446 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

TR IEC 61850-7-500

SCL Modelling of Fault Measurements (RFMX) 02/08/2024 02:12 AM Actions
6436 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

TR IEC 61850-10-3

SCL Modelling of the Test Equipment 02/08/2024 02:36 AM Actions
6433 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low SCL Extensions (partial configuration updates in a top-down approach, mixed editions with private CDCs, etc.) 02/08/2024 03:03 AM Actions
6447 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low Enhanced Quality Information for Measurements (accuracy classes, update periods, filter applied, algorithm applied, etc.) 02/08/2024 03:16 AM Actions
6430 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

IEC 61850-6

Management of SCL File Sizes (Compression Techniques, Handling of Privates) 02/08/2024 03:17 AM Actions
5964 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-2

Incorrect Attribute type of TrgOp 02/08/2024 04:24 AM Actions
5944 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 02/08/2024 04:27 AM Actions
5943 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

New LN of group L (as "LTED") to represent the dynamic topology of the substation. 02/08/2024 04:35 AM Actions
5942 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 02/08/2024 04:37 AM Actions
(1-50/2124) Per page: 25, 50, 100

Also available in: Atom CSV PDF