# Project Tracker ID Source Status Priority Standard(s) Subject Updated
7030 IEC 61850 User Feedback Task Force Bug Resolved Normal Is there a use case for applying more than one trgOpt on a particular DA? 10/22/2024 09:09 AM Actions
7001 IEC 61850 User Feedback Task Force Bug Resolved Normal Presence condition of DO in statistic Logical Nodes 10/22/2024 08:15 AM Actions
6622 IEC 61850 TPWG Bug Rejected Normal Test case Ttf1 (mustUnderstand) for the ICT conformance test needs clarification 12/12/2023 08:19 AM Actions
6596 IEC 61850 User Feedback Task Force Bug Resolved Normal Simulation Mode with Centralized Protection 11/21/2023 08:32 AM Actions
6263 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-6

GOOSE MinTime / Max Time - Probable discrepancy between Part-6 and Part-8 06/20/2023 08:44 AM Actions
6256 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-7-4

IEC 61850-7-4 list of abbreviations 06/06/2023 08:32 AM Actions
6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
6175 IEC 61850 User Feedback Task Force Bug 2022 IOP In Progress Normal

IEC 61850-6

SCL SICS requires SNTP even with 2.1 where PTP is the preferred method. 11/07/2023 08:21 AM Actions
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 06/05/2023 01:58 AM Actions
611 IEC 61850 User Feedback Task Force Bug 5 RTE In Progress Normal

IEC 61850-7-4 / IEC 61850-80-6

Need a new DO (ENUM) to identify the protocol used for the SCADA exchange, in LN ITCI 11/07/2023 08:29 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
7033 IEC 61850 User Feedback Task Force Feature Resolved Normal Addition of DO SPS in the LN KPMP 10/22/2024 09:23 AM Actions
7032 IEC 61850 User Feedback Task Force Feature Triage Normal

IEC 61850-7-4

Addition of a DO in XCBR indicating that the contacts have started to separate 10/22/2024 09:18 AM Actions
6767 IEC 61850 User Feedback Task Force Feature Resolved Normal Specifying virtualized physical devices and LN's 06/03/2024 03:10 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
6246 IEC 61850 User Feedback Task Force Feature Resolved Normal

IEC 61850-6

ExtRef cannot specify a Poll intended to be implemented as a GetDataSetValues request  06/05/2023 01:58 AM Actions
6225 IEC 61850 User Feedback Task Force Feature 60 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - SetPhsOrig 02/28/2023 09:42 AM Actions
6224 IEC 61850 User Feedback Task Force Feature 59 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - SetRef 02/28/2023 09:42 AM Actions
6223 IEC 61850 User Feedback Task Force Feature 58 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - StrVal 02/28/2023 09:42 AM Actions
6222 IEC 61850 User Feedback Task Force Feature 57 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - SetNb 02/28/2023 09:42 AM Actions
6221 IEC 61850 User Feedback Task Force Feature 56 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - OnOff 02/28/2023 09:42 AM Actions
6219 IEC 61850 User Feedback Task Force Feature 54 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - VRtg, ARtg and HzRtg 02/28/2023 09:42 AM Actions
6218 IEC 61850 User Feedback Task Force Feature 53 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - PhyConnITF 02/28/2023 09:42 AM Actions
6217 IEC 61850 User Feedback Task Force Feature 52 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - NamAccRtg 02/28/2023 09:42 AM Actions
6216 IEC 61850 User Feedback Task Force Feature 51 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - SetPhNum 02/28/2023 09:42 AM Actions
5374 IEC 61850 User Feedback Task Force Feature RTE In Progress Normal

IEC 61850-7-4

Creation of a new LN for protection function 11/26/2024 03:32 AM Actions
5336 IEC 61850 User Feedback Task Force Feature 4 TF 61850-80-6 In Progress Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 11/07/2023 08:28 AM Actions
5331 IEC 61850 User Feedback Task Force Feature SCL IOP 2021 Resolved Normal

IEC 61850-6

Multiple LNodes implemented by same LN 06/05/2023 01:58 AM Actions
5124 IEC 61850 User Feedback Task Force Feature 3 TF 61850-80-6 In Progress Normal

IEC 61850-80-6

Telemonitoring blocking 12/21/2021 09:26 AM Actions
5123 IEC 61850 User Feedback Task Force Feature 2 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

ACSI service for link supervision on application level 06/05/2023 01:58 AM Actions
5122 IEC 61850 User Feedback Task Force Feature 1 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

New LN in LN group L to reflect the status of TPAA between Proxy/Gateway and IED 06/05/2023 01:58 AM Actions
5091 IEC 61850 User Feedback Task Force Feature 10 H30 Resolved Normal

IEC 61850-2

Devices types/acronyms 06/05/2023 01:58 AM Actions
5088 IEC 61850 User Feedback Task Force Feature 12 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 8/8 06/05/2023 01:58 AM Actions
5087 IEC 61850 User Feedback Task Force Feature 11 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 7/8 06/05/2023 01:58 AM Actions
5086 IEC 61850 User Feedback Task Force Feature 10 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 6/8 06/05/2023 01:58 AM Actions
5085 IEC 61850 User Feedback Task Force Feature 9 MH Resolved Normal

IEC 61850 7-1 / 7-4 Ed2.1,7-5

Clarifications on the local/remote concept 5/8 06/05/2023 01:58 AM Actions
5084 IEC 61850 User Feedback Task Force Feature 8 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 4/8 06/05/2023 01:58 AM Actions
5083 IEC 61850 User Feedback Task Force Feature 7 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 3/8 06/05/2023 01:58 AM Actions
5082 IEC 61850 User Feedback Task Force Feature 6 MH Resolved Normal

IEC 61850-7-4,7-5

Clarifications on the local/remote concept 2/8 06/05/2023 01:58 AM Actions
5081 IEC 61850 User Feedback Task Force Feature 5 MH Resolved Normal

IEC 61850-7-1 Ed2.1/7-4 Ed2.1 Annex B/7-500

Clarifications on the local/remote concept 1/8 06/05/2023 01:58 AM Actions
5080 IEC 61850 User Feedback Task Force Feature 4 MH Resolved Normal

IEC 61850-7-1 Ed2.1 ,7-500

Clarification on the ctlModel 3/3 06/05/2023 01:58 AM Actions
5079 IEC 61850 User Feedback Task Force Feature 3 MH Resolved Normal

IEC 61850-7-1 Ed2.1, 7-500

Clarification on the ctlModel 2/3 06/05/2023 01:58 AM Actions
5078 IEC 61850 User Feedback Task Force Feature 2 MH Resolved Normal

IEC 61850-7-1 / 7-2 Ed2.1 / 7-5/7-500

Clarification on the ctlModel 1/3 06/05/2023 01:58 AM Actions
677 IEC 61850 User Feedback Task Force Feature 50 RTE In Progress Normal

IEC 61850-7-4

Impact of IEC 61869-13 (SAMU) 02/28/2023 09:42 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 05/09/2023 09:32 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
621 IEC 61850 User Feedback Task Force Feature 17 RTE In Progress Normal

IEC 61850-7-4/7-500

New controllable DO in RREC to define the mode of the recloser of the circuit breaker 05/11/2021 10:08 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 05/09/2023 09:32 AM Actions
(1-50/2246) Per page: 25, 50, 100