Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 11/23/2021 08:34 AM Actions
611 IEC 61850 User Feedback Task Force Bug 5 RTE In Progress Normal

IEC 61850-7-4 / IEC 61850-80-6

Need a new DO (ENUM) to identify the protocol used for the SCADA exchange, in LN ITCI 05/11/2021 09:59 AM Actions
442 IEC 61850 User Feedback Task Force Bug 5 Vattenfall Resolved High

IEC 61850-6-100

Maping LNode (substation section) to LN (IED section) 03/15/2022 09:10 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall In Progress High

IEC 61850-6

How to add utility process name to DOs 02/11/2021 06:37 AM Actions
5374 IEC 61850 User Feedback Task Force Feature RTE Triage Normal

IEC 61850-7-4

Creation of a new LN for protection function 09/19/2022 11:32 AM Actions
5336 IEC 61850 User Feedback Task Force Feature 4 TF 61850-80-6 In Progress Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 04/26/2022 09:20 AM Actions
5331 IEC 61850 User Feedback Task Force Feature SCL IOP 2021 Resolved Normal

IEC 61850-6

Multiple LNodes implemented by same LN 03/29/2022 09:14 AM Actions
5124 IEC 61850 User Feedback Task Force Feature 3 TF 61850-80-6 In Progress Normal

IEC 61850-80-6

Telemonitoring blocking 12/21/2021 09:26 AM Actions
5123 IEC 61850 User Feedback Task Force Feature 2 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

ACSI service for link supervision on application level 06/21/2022 08:35 AM Actions
5122 IEC 61850 User Feedback Task Force Feature 1 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

New LN in LN group L to reflect the status of TPAA between Proxy/Gateway and IED 02/09/2022 07:06 AM Actions
5091 IEC 61850 User Feedback Task Force Feature 10 H30 In Progress Normal

IEC 61850-2

Devices types/acronyms 02/09/2022 10:30 AM Actions
5088 IEC 61850 User Feedback Task Force Feature 12 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 8/8 02/14/2022 03:56 AM Actions
5087 IEC 61850 User Feedback Task Force Feature 11 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 7/8 02/14/2022 03:55 AM Actions
5086 IEC 61850 User Feedback Task Force Feature 10 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 6/8 02/14/2022 03:56 AM Actions
5085 IEC 61850 User Feedback Task Force Feature 9 MH Resolved Normal

IEC 61850 7-1 / 7-4 Ed2.1,7-5

Clarifications on the local/remote concept 5/8 02/14/2022 03:57 AM Actions
5084 IEC 61850 User Feedback Task Force Feature 8 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 4/8 02/14/2022 03:57 AM Actions
5083 IEC 61850 User Feedback Task Force Feature 7 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 3/8 02/14/2022 03:57 AM Actions
5082 IEC 61850 User Feedback Task Force Feature 6 MH Resolved Normal

IEC 61850-7-4,7-5

Clarifications on the local/remote concept 2/8 02/14/2022 03:57 AM Actions
5081 IEC 61850 User Feedback Task Force Feature 5 MH Resolved Normal

IEC 61850-7-1 Ed2.1/7-4 Ed2.1 Annex B/7-500

Clarifications on the local/remote concept 1/8 02/14/2022 02:50 AM Actions
5080 IEC 61850 User Feedback Task Force Feature 4 MH Resolved Normal

IEC 61850-7-1 Ed2.1 ,7-500

Clarification on the ctlModel 3/3 02/14/2022 04:00 AM Actions
5079 IEC 61850 User Feedback Task Force Feature 3 MH Resolved Normal

IEC 61850-7-1 Ed2.1, 7-500

Clarification on the ctlModel 2/3 02/14/2022 03:59 AM Actions
5078 IEC 61850 User Feedback Task Force Feature 2 MH Resolved Normal

IEC 61850-7-1 / 7-2 Ed2.1 / 7-5/7-500

Clarification on the ctlModel 1/3 02/09/2022 07:11 AM Actions
5077 IEC 61850 User Feedback Task Force Feature 1 MH Resolved Normal

IEC61850 7-1

Location of SGCB in LD structures 02/09/2022 10:06 AM Actions
677 IEC 61850 User Feedback Task Force Feature 50 RTE In Progress Normal

IEC 61850-7-4

Impact of IEC 61869-13 (SAMU) 06/21/2022 02:04 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 03/02/2021 09:53 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
622 IEC 61850 User Feedback Task Force Feature 18 RTE Triage Normal

IEC 61850-7-4

Parameters not available in standardized LN 06/20/2022 03:56 AM Actions
621 IEC 61850 User Feedback Task Force Feature 17 RTE In Progress Normal

IEC 61850-7-4/7-500

New controllable DO in RREC to define the mode of the recloser of the circuit breaker 05/11/2021 10:08 AM Actions
620 IEC 61850 User Feedback Task Force Feature 16 RTE Triage Normal New LN LPDO / LPDI in IEC 61850-7-5 06/20/2022 03:55 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 03/02/2021 09:29 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 07/05/2022 08:17 AM Actions
608 IEC 61850 User Feedback Task Force Feature 7 H30 In Progress Normal

IEC 61850-90-xx

Comprehensive set of requirements covering validation and supervision of all IEC 61850 communications 06/21/2022 02:09 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 07/05/2022 08:52 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 07/05/2022 08:48 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

TF Communication supervision

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 09/26/2022 09:55 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 In Progress Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 07/05/2022 08:30 AM Actions
584 IEC 61850 User Feedback Task Force Feature 1122 IOP_2019 Resolved Normal

IEC 61850-6

SCL validation - Should all name parts of PhV be contained in the doName? 07/05/2022 08:20 AM Actions
578 IEC 61850 User Feedback Task Force Feature 50 ENTSO-E In Progress Normal

IEC 61850-7-4

Busbar protection: End Fault protection - model definition required. 02/11/2021 07:10 AM Actions
576 IEC 61850 User Feedback Task Force Feature 48 ENTSO-E In Progress Normal

IEC 61850-7-4

Distance protection: Distance protection - 1 phase and 3 phase zone extension signals are missing 02/11/2021 07:11 AM Actions
575 IEC 61850 User Feedback Task Force Feature 47 ENTSO-E In Progress Normal

IEC 61850-7-4

Protection scheme: Reversal current logic LN/DO/DA missing 02/11/2021 07:13 AM Actions
574 IEC 61850 User Feedback Task Force Feature 46 ENTSO-E In Progress Normal

IEC 61850-7-4

Protection scheme: Weak end infeed (1 phase and 2/3 phase operate missing) 02/11/2021 07:13 AM Actions
573 IEC 61850 User Feedback Task Force Feature 45 ENTSO-E In Progress Normal

IEC 61850-7-4

Tap Changer Supervision: Tap discrepancy (3 pole transformer case) 02/11/2021 07:14 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall In Progress Normal

IEC 61850-6 (-100)

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 02/11/2021 07:59 AM Actions
409 IEC 61850 User Feedback Task Force Feature 4.1 ENTSO-E In Progress Normal Too loose or non existing guideline for organization of structure tree (construction of each LD, LN etc) 02/11/2021 08:00 AM Actions
676 IEC 61850 User Feedback Task Force Support 49 RTE Resolved Normal

IEC 61850-7-5

Clarification of addCause 06/14/2022 10:44 AM Actions
675 IEC 61850 User Feedback Task Force Support 48 RTE Resolved Normal

IEC 61850-7-4 Ed2.1

Clarification of blocked mode 09/29/2021 03:50 AM Actions
660 IEC 61850 User Feedback Task Force Support 1 WG10 In Progress Normal IED model documentation 06/16/2021 09:32 AM Actions
647 IEC 61850 User Feedback Task Force Support 57 ENTSO-E Resolved Normal

IEC 61850-7-5, IEC61850-7-500

Single phase and multi phase trip indication for the autorecloser 04/13/2021 09:42 AM Actions
632 IEC 61850 User Feedback Task Force Support 8 H30 In Progress High

IEC 61850-9-2, IEC 61869-9

APPID 0x4000 - Sampled Values 06/16/2021 09:42 AM Actions
624 IEC 61850 User Feedback Task Force Support 21 RTE Triage Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 09/14/2022 03:40 AM Actions
607 IEC 61850 User Feedback Task Force Support 6 H30 In Progress Normal

IEC 61850-80-6 (90-2)

LPHD.Sim management 06/21/2022 02:09 AM Actions
583 IEC 61850 User Feedback Task Force Support 55 ENTSO-E Triage Normal

IEC 61850-7-4

Autoreclosure: Autoreclosure - 3ph closing command missing 02/16/2021 04:00 AM Actions
582 IEC 61850 User Feedback Task Force Support 54 ENTSO-E Triage Normal

IEC 61850-7-4, 7-5

Synchrocheck: Synchrocheck - missing signals 02/16/2021 04:11 AM Actions
581 IEC 61850 User Feedback Task Force Support 53 ENTSO-E Triage Normal

IEC 61850-7-4, 7-5

S/S related applications: Disturbance recorder - communication session active 02/16/2021 04:11 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-4, 7-5

Voltage protection: Undervoltage protection - 3ph operate 09/28/2022 06:57 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-4, 7-500

Voltage protection: Overvoltage protection - 3ph operate 03/01/2022 09:09 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-4, 7-500

S/S related applications: Auxiliary circuit supervision 03/01/2022 08:37 AM Actions
569 IEC 61850 User Feedback Task Force Support 41 ENTSO-E Triage Normal

IEC 61850-7-4

S/S related applications: Access security system 02/16/2021 04:13 AM Actions
566 IEC 61850 User Feedback Task Force Support 38 ENTSO-E Triage Normal

IEC 61850-7-420

S/S related applications: Diesel aggregat alarm 02/16/2021 04:08 AM Actions
559 IEC 61850 User Feedback Task Force Support 31 ENTSO-E Triage Normal

IEC 61850-7-4

Busbar protection: ARC detection protection 02/16/2021 04:09 AM Actions
558 IEC 61850 User Feedback Task Force Support 30 ENTSO-E Triage Normal

IEC 61850-7-4

Busbar protection (BBP): Diff/Kirchoff BBP 02/16/2021 04:10 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Triage Normal Link Failover reliability problem - implication to protection application 02/09/2022 09:13 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 12/21/2021 08:56 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 06/21/2022 09:26 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 06/21/2022 09:26 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 06/21/2022 09:26 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 06/21/2022 09:26 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 06/21/2022 09:26 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 06/21/2022 09:26 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 06/21/2022 09:26 AM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 06/21/2022 09:17 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

90-16

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/21/2022 09:20 AM Actions
434 IEC 61850 User Feedback Task Force Support 25 ENTSO-E In Progress Normal Freedom of choice what IEC 61850 services are to be tested seem too open. The vendor can select exactly what UCA accredited test 04/02/2021 01:30 PM Actions
424 IEC 61850 User Feedback Task Force Support 15 ENTSO-E In Progress Normal

6

Vendor Tools shall allow (vendor independant) Integration tools doing engineering based on ICD Files, thus allowing them to in 02/03/2021 02:49 PM Actions
419 IEC 61850 User Feedback Task Force Support 10.2 ENTSO-E In Progress Normal

IEC 61850-7-2

Also many other features of GOOSE messaging are left to the manufacturer to choose. 06/14/2022 09:33 AM Actions
417 IEC 61850 User Feedback Task Force Support 9 ENTSO-E In Progress Normal

6-100

There is no mechanism proposed by the Standard to positively identify data points in the data model. For instance PTOC can refer 02/03/2021 02:49 PM Actions
5970 IEC 61850 User Feedback Task Force Improvement 2022 f2F IOP New Normal SCT behavior needs to be specified regarding mismatch between substation section and IED section 09/20/2022 07:26 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement New Normal Change the diagrams in 7-500 to not use yellow lines 09/16/2022 08:38 AM Actions
5960 General Testing Issues Improvement In Progress Normal Herb to review access control of test documents 09/20/2022 07:54 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF New Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 09/13/2022 09:03 AM Actions
5926 General Testing Issues Improvement In Progress Normal Review ICT TP 09/06/2022 08:09 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
5876 IEC 61850 User Feedback Task Force Improvement FNN Germany Resolved Normal

IEC 61850-7-4 Ed.3

Proposal of a new LN class ASWI 08/02/2022 08:56 AM Actions
5372 IEC 61850 User Feedback Task Force Improvement RTE Resolved Normal

IEC 61850-7-1

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 06/07/2022 09:23 AM Actions
5335 IEC 61850 User Feedback Task Force Improvement Dustin Tessier Resolved Normal

IEC 61850-90-4

Adding Normative Requirements & Conformance Testing Pertaining to Broadcast Storms 06/14/2022 09:22 AM Actions
5330 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-6, 6-100

LNode iedName attribute usage needs to be clarified 03/29/2022 09:00 AM Actions
5329 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-6

Clarify iedType attribute usage in DataTypeTemplates 04/12/2022 09:20 AM Actions
5323 IEC 61850 User Feedback Task Force Improvement 3 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow updates to single values while schedules are running 09/30/2022 02:10 AM Actions
5322 IEC 61850 User Feedback Task Force Improvement 2 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - add optional data objects to support irregular interval schedules 09/30/2022 02:03 AM Actions
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 09/30/2022 02:02 AM Actions
5089 IEC 61850 User Feedback Task Force Improvement 13 MH Resolved Normal

IEC 61850 7-3 Ed2.1

Extension of CDC ASG 05/10/2022 09:26 AM Actions
3100 IEC 61850 User Feedback Task Force Improvement 2 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 11/23/2021 08:33 AM Actions
3099 IEC 61850 User Feedback Task Force Improvement 1 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 11/23/2021 08:32 AM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
673 IEC 61850 User Feedback Task Force Improvement 47 RTE Resolved Normal CPU monitoring 09/29/2021 03:50 AM Actions
672 IEC 61850 User Feedback Task Force Improvement 46 RTE Resolved Normal

IEC 61850-90-4

Create DO indicating the source of synchronisation 06/16/2022 03:51 PM Actions
667 IEC 61850 User Feedback Task Force Improvement 4 WG10 Resolved Normal

IEC 61850-7-4

Report of current active setting group 06/30/2021 06:56 AM Actions
633 IEC 61850 User Feedback Task Force Improvement 1 ZIV In Progress Normal

IEC 61850-7-2

Initial values of paramRev and valRev 04/13/2021 09:50 AM Actions