619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 05/09/2023 09:32 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
7032 IEC 61850 User Feedback Task Force Feature Triage Normal

IEC 61850-7-4

Addition of a DO in XCBR indicating that the contacts have started to separate 10/22/2024 09:18 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
6175 IEC 61850 User Feedback Task Force Bug 2022 IOP In Progress Normal

IEC 61850-6

SCL SICS requires SNTP even with 2.1 where PTP is the preferred method. 11/07/2023 08:21 AM Actions
611 IEC 61850 User Feedback Task Force Bug 5 RTE In Progress Normal

IEC 61850-7-4 / IEC 61850-80-6

Need a new DO (ENUM) to identify the protocol used for the SCADA exchange, in LN ITCI 11/07/2023 08:29 AM Actions
7030 IEC 61850 User Feedback Task Force Bug Resolved Normal Is there a use case for applying more than one trgOpt on a particular DA? 10/22/2024 09:09 AM Actions
7001 IEC 61850 User Feedback Task Force Bug Resolved Normal Presence condition of DO in statistic Logical Nodes 10/22/2024 08:15 AM Actions
6596 IEC 61850 User Feedback Task Force Bug Resolved Normal Simulation Mode with Centralized Protection 11/21/2023 08:32 AM Actions
6263 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-6

GOOSE MinTime / Max Time - Probable discrepancy between Part-6 and Part-8 06/20/2023 08:44 AM Actions
6256 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-7-4

IEC 61850-7-4 list of abbreviations 06/06/2023 08:32 AM Actions
6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 06/05/2023 01:58 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
6622 IEC 61850 TPWG Bug Rejected Normal Test case Ttf1 (mustUnderstand) for the ICT conformance test needs clarification 12/12/2023 08:19 AM Actions