Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
6144 IEC TC57 WG10 Future Work WG10 Future Work IOP 2022 New Normal

IEC 61850-6

Need to add SCL mechanism to define a minimum MinTime 10/26/2023 05:21 AM Actions
5944 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 02/08/2024 04:27 AM Actions
5310 IEC TC57 WG10 Future Work WG10 Future Work WG 18 New Normal

IEC 61850-7-3

New CDC for IEC/TC 57/WG 18 02/08/2024 05:19 AM Actions
5943 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

New LN of group L (as "LTED") to represent the dynamic topology of the substation. 02/08/2024 04:35 AM Actions
6427 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-3

New Logical Nodes - Battery Charger 10/26/2023 04:31 AM Actions
6428 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Urgent

IEC 61850-6

Next Steps with IEC 61850-90-11 (Publish versus Corrigenda) 10/26/2023 02:47 AM Actions
6220 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - opDITmms, DITmms 10/26/2023 05:00 AM Actions
6703 IEC TC57 WG10 Future Work WG10 Future Work Ed 3 review New Normal

IEC 61850-7-4, IEC TS 61850-80-4

Part 80-4 Mapping to COSEM : add reactive and apparent energy data objects to MMTR and MMTN 02/09/2024 02:43 PM Actions
5933 IEC TC57 WG10 Future Work WG10 Future Work FNN Germany New Normal

IEC 61850-7-4

Proposal of a new LN class ASWI 02/08/2024 05:06 AM Actions
5937 IEC TC57 WG10 Future Work WG10 Future Work WG10 New Normal

IEC 61850-7-4

Report of current active setting group 02/08/2024 04:46 AM Actions
6410 IEC TC57 WG10 Future Work WG10 Future Work UCA Test. Committee New Normal

IEC 61850-7-2

SBOns to be deprecated in future. 10/26/2023 04:42 AM Actions
5965 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Schedules - allow updates to single values while schedules are running 02/08/2024 05:31 AM Actions
6423 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TS IEC 61850-80-7

SCL Control Block 10/26/2023 04:32 AM Actions
6432 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-30

SCL Engineering Lifecycle, Types and Security for SCL files and Elements 10/26/2023 04:26 AM Actions
6433 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low SCL Extensions (partial configuration updates in a top-down approach, mixed editions with private CDCs, etc.) 02/08/2024 03:03 AM Actions
6446 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

TR IEC 61850-7-500

SCL Modelling of Fault Measurements (RFMX) 02/08/2024 02:12 AM Actions
6417 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-4

SCL Modelling of the Communication Network and All its Components 10/26/2023 04:40 AM Actions
6436 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

TR IEC 61850-10-3

SCL Modelling of the Test Equipment 02/08/2024 02:36 AM Actions
6185 IEC TC57 WG10 Future Work WG10 Future Work 2022 IOP New Normal

IEC 61850-6

SCL Need to differentiate the difference in the number of GOOSE vs R-GOOSE 10/26/2023 05:01 AM Actions
5121 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-2

sFt2ab does not verify that the LastModified value is consistent or changes when file is modified 02/08/2024 05:18 AM Actions
5934 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

TR IEC 61850-10-3, TR IEC 61850-90-20

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 02/08/2024 05:02 AM Actions
5878 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Technical reports to be considered in edition 3 of IEC 61850-7-4 02/08/2024 05:20 AM Actions
6265 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

track changes in SCL to know when a device needs to be updated based on new SCD version 02/19/2024 10:56 AM Actions
6411 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Urgent

TR IEC 61850-7-500, TR IEC 61850-90-3

Update the Model of Circuit Breaker/Disconnector Switch 10/26/2023 03:08 AM Actions
6143 IEC TC57 WG10 Future Work WG10 Future Work New High

TR IEC 61850-7-500, TR IEC 61850-90-3

Update the Switchgear / Breaker Model 10/26/2023 03:50 AM Actions
(2201-2225/2227) Per page: 25, 50, 100

Also available in: Atom CSV PDF