6265 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

track changes in SCL to know when a device needs to be updated based on new SCD version 02/19/2024 10:56 AM Actions
6654 Client Issues Resolved Normal Tracking numbering mismatch Ed2 <> Ed2.1 01/09/2024 08:27 AM Actions
1912 IEC 61850 Certificate IEC 61850 Certificate Approved Normal Transformer Protection Relay-T [M/s. Easun Reyrolle Ltd. (ERLPhase)] 07/08/2021 04:18 PM Actions
2071 IEC 61850 Certificate IEC 61850 Certificate Approved Normal TRF300 Protection and Control [YPP Corporation] 07/08/2021 04:24 PM Actions
2731 IEC 61850 Certificate IEC 61850 Certificate Approved Normal TSL-9r Busbar and Breaker Failure prot [ZPrAE Sp.Z o.o.] 07/08/2021 04:51 PM Actions
6631 SCL Tooling Issues Resolved Normal tTf1 (mustUnderstand) for the ICT test needs clarification 01/09/2024 08:59 AM Actions
6200 SCL Tooling Issues Resolved Normal tTf1 change Ed2/2007B to Ed2.1/2007B4 01/24/2023 08:33 AM Actions
6327 SCL Tooling Issues Resolved Normal tTf2 - export CID file only for Ed2.1? 05/16/2023 08:20 AM Actions
6323 SCL Tooling Issues Resolved Normal tTtf5 IED name=None is not allowed tissue #1365 05/02/2023 08:20 AM Actions
5118 IEC 61850 Certificate IEC 61850 Certificate Approved Normal TwinCarp [Hsiang Cheng Electric Corp] 11/10/2021 10:34 AM Actions
5096 IEC 61850 Certificate IEC 61850 Certificate Approved Normal TwinCarp [Hsiang Cheng Electric Corp] 09/30/2021 11:26 AM Actions
6206 Server Issues Rejected Normal Type and size of Length field value (TLV) encoding in SV 01/11/2023 06:19 AM Actions
5167 WG14 Part 1 Issues CIM Issues New Normal Typo 01/12/2022 02:43 PM Actions
6496 61850-7-5 and 61850-7-500 IEC61850-7-5 New Normal Typo in section 13.3 08/02/2023 08:54 AM Actions
5195 WG14 Part 1 Issues CIM Issues New Normal Typos in Annex A 01/12/2022 02:44 PM Actions
1953 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UAC 420 Automation and Control [EFACEC] 07/08/2021 04:19 PM Actions
2253 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UAP [SISCO, Inc.] 07/08/2021 04:30 PM Actions
3034 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UC 500 Station Server [EFACEC ] 07/11/2021 10:20 AM Actions
6490 Client Issues Resolved Normal UCAiug requires Ed2Amd1 Jan 2024 - expect testlabs/toolvendors need more time 08/22/2023 08:16 AM Actions
1989 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UDC-501 [SHR Automation] 07/08/2021 04:21 PM Actions
1990 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UDM-502 [SHR Automation] 07/08/2021 04:21 PM Actions
1991 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UDW-501 [Sieyuan Electric] 07/08/2021 04:21 PM Actions
6712 WG13 Issues CIM Issues Review Normal UML descriptions for <<Primitive>> types in the Domain package need review and references to W3C and other standards migration into IS publications. 02/28/2024 10:27 AM Actions
6241 WG14 Part 3 Issues CIM Issues New Normal UnplannedOutages does not provide a way to capture affected kVA for IEEE load-based indices 01/31/2023 03:23 PM Actions
6240 WG14 Part 3 Issues CIM Issues New Normal UnplannedOutages has no way to indicate that the outage should be excluded from reliability reporting. 01/31/2023 02:59 PM Actions
6243 WG14 Part 3 Issues CIM Issues New Normal UnplannedOutages is missing OutageArea and AreaKind 01/31/2023 03:29 PM Actions
6239 WG14 Part 3 Issues CIM Issues New Normal UnplannedOutages profile needs ability to capture de-energized and energized times per UsagePoint 01/31/2023 02:26 PM Actions
2590 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UNT-EAP Main Unit of Arc Protection [BAODING UNT ELECTRIC CO., LTD.] 07/08/2021 04:46 PM Actions
5013 WG13 Issues CIM Issues Open Normal Unused abstract classes in profilesSometimes inheritance i 09/14/2021 06:25 PM Actions
6249 CIM Issues CIM Issues New Normal Update CIM namespace 02/06/2023 01:17 PM Actions
6632 WG13 Issues CIM Issues New Normal

61970-301

update definition of deprecated 03/11/2024 03:56 PM Actions
6630 WG13 Issues CIM Issues New Normal

61970-301

Update Identity and naming description 12/11/2023 04:43 AM Actions
6751 IEC 61850 TPWG Issues Resolved Normal Update IEC 61850 QAP Addendum for adding requirement quickly 04/16/2024 08:16 AM Actions
6636 WG14 Issues CIM Issues New Normal

61968-3;61968-4;61968-5;61968-6

Update Name model for all XSD based profiles 12/13/2023 07:27 AM Actions
6713 WG13 Issues CIM Issues New Normal Update namespace and profile from http to https 02/18/2024 08:35 AM Actions
5178 WG14 Part 1 Issues CIM Issues New Normal Update Section 3.3 / Table 2 01/12/2022 02:43 PM Actions
5177 WG14 Part 1 Issues CIM Issues New Normal Update Section 5.6 / Last paragraph 01/12/2022 02:43 PM Actions
5176 WG14 Part 1 Issues CIM Issues New Normal Update Section A.6 / Table A.2 01/12/2022 02:43 PM Actions
6321 CIM Issues CIM Issues New Normal Update the description of MktActivityRecord 04/20/2023 03:46 AM Actions
6411 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Urgent

TR IEC 61850-7-500, TR IEC 61850-90-3

Update the Model of Circuit Breaker/Disconnector Switch 10/26/2023 03:08 AM Actions
5863 WG16 Issues CIM Issues Open Normal Update the set of DemandSideResourceInterfaceProfiles from WG21 08/08/2022 06:05 PM Actions
6143 IEC TC57 WG10 Future Work WG10 Future Work New High

TR IEC 61850-7-500, TR IEC 61850-90-3

Update the Switchgear / Breaker Model 10/26/2023 03:50 AM Actions
6377 61850-7-5 and 61850-7-500 IEC61850-7-5 New High Update the Switchgear / Breaker Model 06/14/2023 08:17 AM Actions
2351 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UR F60 [GE Multilin] 07/08/2021 04:35 PM Actions
6187 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UR N60 Edition 2 Server 11/24/2022 08:18 AM Actions
2737 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UR N60 Network Stability and Synchrophas [GE Grid Automation] 08/04/2021 09:38 AM Actions
2738 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UR N60 Network Stability and Synchrophas [GE Grid Automation] 08/04/2021 09:38 AM Actions
3028 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UR N60 Network Stability and Synchrophas [GE Grid Automation] 08/04/2021 09:37 AM Actions
2934 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UR N60 Network Stability and Synchrophas [GE Renewable Energy] 08/04/2021 09:38 AM Actions
2206 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UR N60 [GE Digital Energy] 07/08/2021 04:29 PM Actions