Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
564 IEC 61850 User Feedback Task Force Support 36 ENTSO-E Closed Normal

IEC 61850-90-6

S/S related applications: Auxiliary transfer 02/11/2021 07:01 AM Actions
442 IEC 61850 User Feedback Task Force Bug 5 Vattenfall Closed High

IEC 61850-90-30

Maping LNode (substation section) to LN (IED section) 12/05/2023 08:30 AM Actions
441 IEC 61850 User Feedback Task Force Improvement 4 Vattenfall Closed High

IEC 61850-90-30

Limitations of one to one mapping between LNode and LN 12/05/2023 08:28 AM Actions
568 IEC 61850 User Feedback Task Force Support 40 ENTSO-E Closed Normal

IEC 61850-90-3

S/S related applications: Fire detection/extinction 02/11/2021 06:59 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
601 IEC 61850 User Feedback Task Force Feature 637 IOP_2019 Closed Normal

IEC 61850-90-16

ICD files with empty type=”” attribute in their IED element 06/21/2022 09:29 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
541 IEC 61850 User Feedback Task Force Support 22 IOP_2017/36 Closed Normal

IEC 61850-9-2(LE), IEC 61869-9

APPID rules for backward compatible variants (9-2LE) shall be noted in IEC 61869-9 06/21/2022 09:24 AM Actions
531 IEC 61850 User Feedback Task Force Feature 12 IOP_2017/21 Closed Normal

IEC 61850-8-1, IEC 61850-9-2

Merging Unit is not capable to publish SV outside of the recommended destination MAC address range (even though 8-1 is informative) 06/21/2022 09:24 AM Actions
521 IEC 61850 User Feedback Task Force Feature 2 IOP_2017/3 Closed Normal

IEC 61850-8-1

The GSEControl has a datSet element indicating that the gocb is configured (but with no communication entry) 06/21/2022 09:24 AM Actions
543 IEC 61850 User Feedback Task Force Feature 24 IOP_2017/40 Closed Normal

IEC 61850-8-1

Operability issues between vendors that prevent R-SV testing between substations 02/11/2021 07:20 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Overvoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
561 IEC 61850 User Feedback Task Force Support 33 ENTSO-E Closed Normal

IEC 61850-7-500

Pole discrepancy: no LN to cover Trip and pole disc 02/11/2021 06:53 AM Actions
544 IEC 61850 User Feedback Task Force Feature 25 IOP_2017/44 Closed Normal

IEC 61850-7-5

TestBlock condition implemented only in XCBR and not in any of Rxxx and Pxxx logical node 02/11/2021 07:19 AM Actions
570 IEC 61850 User Feedback Task Force Support 42 ENTSO-E Closed Normal

IEC 61850-7-5

Health: Health of prot relay/subfunction 02/11/2021 06:55 AM Actions
566 IEC 61850 User Feedback Task Force Support 38 ENTSO-E Closed Normal

IEC 61850-7-420

S/S related applications: Diesel aggregat alarm 12/06/2022 09:35 AM Actions
(1-25/3030) Per page: 25, 50, 100

Also available in: Atom CSV PDF