Project

General

Profile

IEC 61850 Certificate #6888

REF650

Added by Herbert Falk 4 months ago. Updated 4 months ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Server
Company:
Hitachi Energy Sweden AB
Address:

SE-721 59 Vasteras
Sweden

Product:
REF650
HW Version:
3.0.1
SW Version:
0.5.23.286
Key Words:
Test Procedure Version:

2.0.6

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Publish (9a), GOOSE Subscribe (9b), Service Tracking (B15), Setting Group (B4), Substitution (B3), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
08/27/2024
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
DNV Netherlands (A)
Certificate Name:
24-4156_DNV_HITACHI_REF650_ServerEd2_Certificate.pdf
Certificate Hash:
SHA256: 4EAA72B7B81B0CD75C0EAD5A0CBA53280ACDD731E85E6AC1508B49DB812D9E56
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
T2344092
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-
Product Variants:
Time Activated Control:

Description

Multi-application feeder protection and control


Files


Related issues

Copied from IEC 61850 Certificate - IEC 61850 Certificate #6887: REF650 ApprovedActions
#2

Updated by Herbert Falk 4 months ago

  • File deleted (24-4125_DNV_HITACHI_REF650_ServerEd2Amd1_Certificate.pdf)
#3

Updated by Herbert Falk 4 months ago

  • IEC 61850 Blocks Certified Time Synchronization (B13) added
  • IEC 61850 Blocks Certified deleted (Time sync SNTP (B13a))

Also available in: Atom PDF