Project

General

Profile

IEC 61850 Certificate #6648

DCAP-6701

Added by Herbert Falk about 1 year ago. Updated about 1 year ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Server
Company:
TsingEnergy M&C Co. , Ltd.
Address:

No.369 Zhonghuan West Road, Tianjin Economic Area, China

Product:
DCAP-6701
HW Version:
V1.00
SW Version:
V1.10
Key Words:
Relay
Test Procedure Version:

2.0.6

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Publish (9a), GOOSE Subscribe (9b), Setting Group (B4), Setting Group Definition (B4+), Substitution (B3), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
12/16/2023
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Xuchang KETOP Testing Research Institute Co.(A)
Certificate Name:
TsingEnergy M&C Co. , Ltd._ DCAP-6701 Universal Protection Measuring and Control Unit_2023PUCA000003_KETOP.pdf
Certificate Hash:
SHA256: D95E2D74BAB2D8CAB973C24718BDD7DBFEF153D3483C452E21939242B71932F6
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-
Product Variants:
Time Activated Control:

Description

This device is typically used in power systems for monitoring, controlling, and protecting the system from faults or abnormal conditions.


Files


Related issues

Related to IEC 61850 Certificate - IEC 61850 Certificate #6647: DCAP-6701ApprovedActions
#1

Updated by Herbert Falk about 1 year ago

#2

Updated by Herbert Falk about 1 year ago

  • Optional Reservation Test changed from No to Yes

Also available in: Atom PDF