Project

General

Profile

IEC 61850 Certificate #6644

DCAP-6701

Added by Herbert Falk 5 months ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Server
Company:
TsingEnergy M&C Co. , Ltd.
Address:

No.369 Zhonghuan West Road, Tianjin Economic Area, China

Product:
DCAP-6701
HW Version:
V1.00
SW Version:
V1.10
Key Words:
Test Procedure Version:

2.0.6

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Publish (9a), GOOSE Subscribe (9b), Setting Group (B4), Setting Group Definition (B4+), Substitution (B3), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
12/13/2023
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Xuchang KETOP Testing Research Institute Co.(A)
Certificate Name:
TsingEnergy M&C Co. , Ltd._ DCAP-6701 Universal Protection Measuring and Control Unit_2023PUCA000003_KETOP.pdf
Certificate Hash:
SHA256: DE9F269A845BFC72BAFB59BD25932925DC451EEA9B938B25E1342C297365AD76
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-

Description

This device is typically used in power systems for monitoring, controlling, and protecting the system from faults or abnormal conditions.


Files

No data to display

Also available in: Atom PDF