Project

General

Profile

IEC 61850 Certificate #6577

P14DL

Added by Herbert Falk 6 months ago. Updated 6 months ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Server
Company:
GE Renewable Energy Ltd.
Address:

St. Leonards Building, Harry Kerr Drive
Stafford, ST16 1WT
United Kingdom

Product:
P14DL
HW Version:
E
SW Version:
05
Key Words:
Bay Controller, Breaker, Feeder, Protection, Relay
Test Procedure Version:

2.0.6

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Control Block (9), GOOSE Publish (9a), SBO Control (12b), Setting Group (B4), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
11/06/2023
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Grid Automation Laboratories (B)
Certificate Name:
50745.614D.803_GE_P14DL_Enhanced_05_Edition2_Certificate.pdf
Certificate Hash:
50745.614D.803_GE_P14DL_Enhanced_05_Edition2_Certificate.pdf
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-

Description

GE Multilin Agile P14DL Feeder Protection System


Files

#1

Updated by Herbert Falk 6 months ago

  • Optional Reservation Test changed from No to Yes
#2

Updated by Herbert Falk 6 months ago

  • IEC 61850 Blocks Certified Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Control Block (9), GOOSE Publish (9a), SBO Control (12b), Setting Group (B4), Time Synchronization (B13), Unbuffered Reporting (B5) added

Also available in: Atom PDF