Project

General

Profile

IEC 61850 Certificate #6363

SA ICD (Substation Automation Information Connecting Device) DW-IPC-A-20000

Added by Herbert Falk 11 months ago. Updated 11 months ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Client
Company:
DoWoo Digitech. Co., Ltd
Address:

A-708, Ssangyong IT Twin-tower,
Dunchon-daero, Jungwon-gu,
Seongnam-si, Gyeonggi-do,
Republic of Korea

Product:
SA ICD (Substation Automation Information Connecting Device) DW-IPC-A-20000
HW Version:
DW-IPC
SW Version:
1.0/Windows Server 2019 Standard
Key Words:
Test Procedure Version:

1.2

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Control Block (9), SBO Control (12b), Service Tracking (B15), Setting Group (B4), Setting Group Definition (B4+), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
05/31/2023
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Korea Testing Laboratory (A)
Certificate Name:
23-014053-04-3_Dowoo_SA-ICD_Client_Ed2_Certificate_KTL.pdf
Certificate Hash:
SHA256: 5BD946AAA13B7AD3B3F48584C22E729543DAB62BE62EF27ABC771B3463207388
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
DW 2301 IPCA2 001
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-

Files

#1

Updated by Herbert Falk 11 months ago

  • Standards Tested 61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4 added

Also available in: Atom PDF