Project

General

Profile

IEC 61850 Certificate #6362

SA-OPD (Substation Automation Operation Processing Device) Z8 G4

Added by Herbert Falk 11 months ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Client
Company:
DoWoo Digitech Co. Ltd
Address:

A-708, Ssangyong IT T win-tower,
Dunchon-daero, Jungwon-gu
Seongnam-si, Gyeonggi-do,
Republic of Korea

Product:
SA-OPD (Substation Automation Operation Processing Device) Z8 G4
HW Version:
GO Z8 G4
SW Version:
1.0/Windows Server 2019 Standard
Key Words:
Test Procedure Version:

1.2

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Control Block (9), SBO Control (12b), Service Tracking (B15), Setting Group (B4), Setting Group Definition (B4+), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
05/31/2023
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Korea Testing Laboratory (A)
Test Document:
Certificate Name:
23-014052-01-3_Dowoo_SA-OPD_Client_Ed2_Certificate_KTL.pdf
Certificate Hash:
SHA256: C6842A0447B0B9C28DFB455E2143AC4E9C5F412C71A741C5AC3C423CAC6BF88E
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
No
Serial Number:
4CE1251S0B
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-

Files

No data to display

Also available in: Atom PDF