Project

General

Profile

IEC 61850 Certificate #6309

MiCOM P40 Agile

Added by Herbert Falk over 1 year ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Server
Company:
GE Renewable Energy
Address:

St. Leonards Building, Harry Kerr Drive
Stafford ST16 1WT
United Kingdom

Product:
MiCOM P40 Agile
HW Version:
M
SW Version:
91B
Key Words:
Differential, Relay
Test Procedure Version:

2.0.5

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
03/30/2023
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Grid Automation Laboratories (B)
Certificate Name:
50745.6741.802_GE_P741_V91B_Edition2_Certificate.pdf
Certificate Hash:
SHA256: F270CA74DC4F8833DC97B2136DBFAA30E9788AE8E8A369E0C90F5328486267D0
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-
Product Variants:
Time Activated Control:

Description

Distributed Busbar Differential Protection Relay


Files

No data to display

Also available in: Atom PDF