Project

General

Profile

IEC 61850 Certificate #6232

SA OPD (Substation Automation Operation Processing Device) Z8

Added by Herbert Falk about 1 year ago. Updated about 1 year ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Client
Company:
WOODAM TECH CO., LTD.
Address:

33, Daeposandan 1-ro,
Yangchon-eup, Gimpo-si,
Gyeonggi-do, Republic of Korea

Product:
SA OPD (Substation Automation Operation Processing Device) Z8
HW Version:
HP Z8 G4
SW Version:
1.0.0
Key Words:
Test Procedure Version:

1.2

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Control Block (9), SBO Control (12b), Service Tracking (B15), Setting Group (B4), Setting Group Definition (B4+), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
01/30/2023
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Korea Testing Laboratory (A)
Certificate Name:
22-065615-03-1_WOODAM Tech_SA-OPD_Client_Ed2_Certificate_KTL.pdf
Certificate Hash:
SHA256: BB7D231268C49B3334223BAC8F344430E508459B4D8C638CB7D74439748F6F8B
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-

Description

SA OPD (Substation Automation Operation
Processing Device)
Z8


Files

#1

Updated by Herbert Falk about 1 year ago

  • IEC 61850 Blocks Certified GOOSE Control Block (9) added

Also available in: Atom PDF