https://redmine.ucaiug.org/https://redmine.ucaiug.org/favicon.ico?15861924492022-08-02T16:54:55ZUCAIug Issue Tracking SystemServer - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=43462022-08-02T16:54:55Zyifan wang
<ul><li><strong>Clause Reference</strong> set to <i>Ed2.0 Server TP2.0.6 CB9b: GOOSE subscribe</i></li></ul> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=45052022-08-09T14:00:18ZIEC 61850 TPWG
<ul><li><strong>Due date</strong> changed from <i>08/03/2022</i> to <i>09/06/2022</i></li><li><strong>Status</strong> changed from <i>New</i> to <i>In Progress</i></li><li><strong>Assignee</strong> set to <i>Richard Schimmel</i></li></ul> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=45092022-08-09T15:21:43Zyifan wang
<ul><li><strong>Description</strong> updated (<a title="View differences" href="/journals/4509/diff?detail_id=6299">diff</a>)</li><li><strong>Priority</strong> changed from <i>Normal</i> to <i>Urgent</i></li></ul> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=45362022-08-23T14:29:15ZRichard Schimmel
<ul><li><strong>File</strong> <a href="/attachments/2571">Solution to redmine sGos with report 5917.docx</a> <a class="icon-only icon-download" title="Download" href="/attachments/download/2571/Solution%20to%20redmine%20sGos%20with%20report%205917.docx">Solution to redmine sGos with report 5917.docx</a> added</li><li><strong>Initial Test Document</strong> set to <i>Ed2Amd1 TP1.1 and Ed2 TP2.0.6</i></li></ul><p>see proposal attached file</p> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=45452022-09-06T13:13:51ZIEC 61850 TPWG
<ul><li><strong>Due date</strong> changed from <i>09/06/2022</i> to <i>09/20/2022</i></li></ul> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=45582022-09-06T15:18:31ZThierry Dufaurethierry.dufaure@siemens.com
<ul></ul><p>I principle I agree,<br />The attached file nevertheless only concentrate on changing: "GOOSE message" to "GOOSE message or Report", but does not change the test description:<br />"with subscribed GOOSE (ping-pong meachnism)" to the proposed "with the pinong-pong mechanism involving GOOSE subscription, and either GOOSE publish or Report"....<br />I think the attached proposal need to be updated.</p> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=47012022-10-04T07:57:29ZRichard Schimmel
<ul><li><strong>File</strong> <a href="/attachments/2596">Solution to redmine sGos with report 5917 (4oct2022).docx</a> <a class="icon-only icon-download" title="Download" href="/attachments/download/2596/Solution%20to%20redmine%20sGos%20with%20report%205917%20(4oct2022).docx">Solution to redmine sGos with report 5917 (4oct2022).docx</a> added</li></ul><p>The “goose ping-pong mechanism” is specified in detail after the table of abstract test procedures. And then referred to in each test procedure. We don’t need to copy the ping-pong mechanism details in each test procedure again. I propose we just improve the introduction text:</p>
<p>To perform the DUT subscribe test procedures the DUT need to be configured with a <strong>GOOSE ping-pong mechanism</strong> as follows:<br />• a data value that is connected to a subscribed GOOSE member, e.g. GGIO.SPS01<br />• a data set that contains the value of this data point<br />• a GoCB that publishes this data set <strong>or a RCB that sends a data change/quality change report</strong><br />• the subscribed GOOSE messages have variable length encoding unless specified otherwise (sGos9</p> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=47132022-10-04T13:57:04ZIEC 61850 TPWG
<ul></ul><p>"GOOSE ping-pong" change to "ping-pong", otherwise accepted.</p> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=47202022-10-04T14:16:37ZIEC 61850 TPWG
<ul><li><strong>Due date</strong> changed from <i>09/20/2022</i> to <i>10/18/2022</i></li></ul> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=47232022-10-05T07:11:02ZRichard Schimmel
<ul><li><strong>File</strong> <a href="/attachments/2601">Solution to redmine sGos with report 5917 (5oct2022).docx</a> <a class="icon-only icon-download" title="Download" href="/attachments/download/2601/Solution%20to%20redmine%20sGos%20with%20report%205917%20(5oct2022).docx">Solution to redmine sGos with report 5917 (5oct2022).docx</a> added</li></ul><p>Updated the attachment as agreed upon</p> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=47262022-10-17T14:42:22ZThierry Dufaurethierry.dufaure@siemens.com
<ul></ul><p>I agree with the proposed changed of draft from Oct, 5th.</p> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=47352022-10-18T13:59:32ZIEC 61850 TPWG
<ul><li><strong>Status</strong> changed from <i>In Progress</i> to <i>Resolved</i></li></ul> Server - Issues #5917: 'Expected result' for some test cases of CB9b: GOOSE subscribehttps://redmine.ucaiug.org/issues/5917?journal_id=70842024-03-01T15:55:10ZRichard Schimmel
<ul><li><strong>Status</strong> changed from <i>Resolved</i> to <i>Closed</i></li><li><strong>Updated Test Document</strong> set to <i>TP1.3</i></li></ul>