Project

General

Profile

IEC 61850 Certificate #5881

DS Agile aView System HMI [GE Renewable Energy]

Added by Bruce Muschlitz over 1 year ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Client
Company:
GE Renewable Energy
Address:

Pare Eureka
81, rue Euclide, CS 11140
34060 Montpellier cedex 2, France

Product:
DS Agile aView System HMI
HW Version:
DS Agile Agency version 8.0.2.0
SW Version:
7.15.5.0
Key Words:
HMI
Test Procedure Version:

1.2

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Bruce.Muschlitz
Approval Date:
07/12/2022
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Grid Automation Laboratories (B)
Test Document:
Certificate Name:
50745.6aView.801
Certificate Hash:
SHA256: A49D4CFFD8FDAD0F4167ABCE6D7FA48DD04E24DC4B2A4F09538555ED943BFBCA
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
GE
Optional Reservation Test:
Yes
Serial Number:
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-

Files

No data to display

Also available in: Atom PDF