CIM Issues #5804

Add meteredDataCollectionMethod attribute (String) in the MarketEvaluationPoint class

Added by Herbert Falk 11 months ago. Updated 9 months ago.

Status:
In Progress
Priority:
Normal
Author/Contact Info:
Jan (ebIX 2019/8)
Base Release:
iec61970cim17v34_iec61968cim13v12_iec62325cim04v07
Solution to be Applied To:
Solution Version:
Solution Applied By:
Completion Date:
CIM Keywords:
Breaking Change:
Breaking Change Description:
CIM Impacted Groups:
None
Requestor:
Standard(s):
Version:
Clause:
MarketEvaluationPoint
Sub-Clause:
Paragraph:
Table:
Originally Closed in Version:
Origination Date:
12/18/2019
Origination ID:
16_0088
Originally Assigned To:

Description

Add meteredDataCollectionMethod attribute (String) in the MarketEvaluationPoint class [0..1]

This will inform the Energy supplier if the values are collected manually or automatically.


Proposed Solution

Has been discussed with WG14 and the suggestion was to add an attribute (boolean flag) to EndDevice: "isAMR".
However, how the values are collected is rather a code (enumeration), not a boolean flag, e.g. more codes could be added when needed.
The suggestion to add "isAMR" to EndDevice could then be withdrawn, seen from a WG16 perspective.
Suggested definition: Specifies how a Metered Data Collector collects data from the Meter for the Market Evaluation Point, such as Automatic or Manually.


Decision

3/10/2022: Note: Withdraw the request to WG14 for the isAMR attribute for EndDevice.
3/24/2022: Planned to be modeled in MarketManagement package.

#1

Updated by Becky Iverson 10 months ago

  • Status changed from New to Open
  • Proposed Solution updated (diff)
  • Decision updated (diff)
#2

Updated by Alvaro Marciel 10 months ago

meteredDataCollectionMethod already available in MarketEvaluationPoint class. Issue can be closed.