Project

General

Profile

CIM Issues #5191

Discussion on the IEC 62913 Ed 1 SGAM to identify any gaps for Part-1 IRM

Added by Herbert Falk almost 3 years ago.

Status:
New
Priority:
Normal
Author/Contact Info:
Base Release:
Solution to be Applied To:
Solution Version:
Solution Applied By:
Completion Date:
CIM Keywords:
Breaking Change:
No
Breaking Change Description:
CIM Impacted Groups:
WG13
Requestor:
Standard(s):
Version:
Clause:
Sub-Clause:
Paragraph:
Table:
Originally Closed in Version:
Origination Date:
09/18/2015
Origination ID:
34
Originally Assigned To:

Proposed Solution

Compare this to the SGIP list (see Issue #24) for gap analysis (granularity is a concern or how to group). It is agreed to list logical functions rather than individual physical actors such as pool pump. IEC62931 is about Generic Smart Grid Requirements.


Decision

[2017-10-31]: Keep it open. Leave this for 61970-1 (Svein). Need to visit the multiple layer architecture design. [2018-10-02]: Leave this for next edition or the 61970-1 CDV. Keep this open. Please see the IEC Smart Grid Map (link posted in the 2018-09-18 Meeting Minutes)

No data to display

Also available in: Atom PDF