CIM Issues #4481

Multiple regulation schedules at controlled point At IOP 10

Added by Herbert Falk about 3 years ago.

Status:
Closed
Priority:
Normal
Author/Contact Info:
IOP10 by lars-ola.g.osterlund@se.abb.com
Base Release:
Solution to be Applied To:
Solution Version:
CIM11
Solution Applied By:
Completion Date:
CIM Keywords:
Breaking Change:
No
Breaking Change Description:
CIM Impacted Groups:
WG13
Requestor:
Standard(s):
Version:
Clause:
Sub-Clause:
Paragraph:
Table:
Originally Closed in Version:
CIM11
Origination Date:
09/27/2007
Origination ID:
395
Originally Assigned To:

Description

Multiple regulation schedules at controlled point
At IOP 10 there was cases where multiple equipment controlled the same cim:Terminal, i.e. the equipment had the same cim:Terminal reference. In some cases equipment controlling the same cim:Terminal referred to different cim:RegulationSchedules. This raise the question what cim:RegulationSchedule to use so that conflicting voltage control is avoided.


Proposed Solution

The simplest solution is to move the reference to the cim:RegulationSchedule from the controlling object to the controlled point, i.e. the object where the cim:Terminal is located.


Decision

2009-06-08: KLH - This issue was corrected with the introduction of the RegulatingControlClass